IAC Assessment: UA0223
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: UA0223
IAC Center University of Alabama
Assessment Year 2020
Principal Product Rough sawn lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 49
Plant Area (Sq.Ft.) 958,320
Annual Production 1,500 Thousand Feet
Production Hrs. Annual 2,340
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,197 1,420,415 kWh $0.05
Electricity Demand $59,052 8,681 kW-months/year $6.80
Electricity Fees $24,241 - $ -
Wood $65,315 38,478 MMBtu $1.70
TOTAL ENERGY COSTS $223,805
RECOMMENDED SAVINGS* $6,015 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,793
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Wood Electricity Usage Electricity Demand Electricity Fees Wood
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$965
Cost:
$562
$462 8,727 $355 52 $148 - - - $462
8,727
kWh
$355
52
kW-months/year
$148
-
$
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,828
Cost:
$1,395
$1,222 23,092 $326 48 $280 - - - $1,222
23,092
kWh
$326
48
kW-months/year
$280
-
$
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,686
Cost:
$250
$989 18,680 $439 65 $258 - - - $989
18,680
kWh
$439
65
kW-months/year
$258
-
$
-
-
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,536
Cost:
$3,806
- - - - - - $1,536 905 -
-
kWh
-
-
kW-months/year
-
-
$
$1,536
905
MMBtu
TOTAL RECOMMENDED Savings:
$6,015
Cost:
$6,013
$2,673 50,499 $1,120 165 $686 - $1,536 905 $2,673
50,499
kWh
$1,120
165
kW-months/year
$686
-
$
$1,536
905
MMBtu
TOTAL IMPLEMENTED Savings:
$2,793
Cost:
$1,957
$1,684 31,819 $681 100 $428 - - - $1,684
31,819
kWh
$681
100
kW-months/year
$428
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Wood Electricity Usage Electricity Demand Electricity Fees Wood