IAC logo
IAC Assessment: UA0223
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0223
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2020
Principal Product Rough sawn lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 49
Plant Area (Sq.Ft.) 958,320
Annual Production 1,500 Thousand Feet
Production Hrs. Annual 2,340
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,197 1,420,415 kWh $0.05
Electricity Demand $59,052 8,681 kW-months/year $6.80
Electricity Fees $24,241 - $ -
Wood $65,315 38,478 MMBtu $1.70
TOTAL ENERGY COSTS $223,805
RECOMMENDED SAVINGS* $6,015 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,793
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Wood Electricity Usage Electricity Demand Electricity Fees Wood
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$965
Cost:
$562
$462 8,727 $355 52 $148 - - - $462
8,727
kWh
$355
52
kW-months/year
$148
-
$
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,828
Cost:
$1,395
$1,222 23,092 $326 48 $280 - - - $1,222
23,092
kWh
$326
48
kW-months/year
$280
-
$
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,686
Cost:
$250
$989 18,680 $439 65 $258 - - - $989
18,680
kWh
$439
65
kW-months/year
$258
-
$
-
-
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,536
Cost:
$3,806
- - - - - - $1,536 905 -
-
kWh
-
-
kW-months/year
-
-
$
$1,536
905
MMBtu
TOTAL RECOMMENDED Savings:
$6,015
Cost:
$6,013
$2,673 50,499 $1,120 165 $686 - $1,536 905 $2,673
50,499
kWh
$1,120
165
kW-months/year
$686
-
$
$1,536
905
MMBtu
TOTAL IMPLEMENTED Savings:
$2,793
Cost:
$1,957
$1,684 31,819 $681 100 $428 - - - $1,684
31,819
kWh
$681
100
kW-months/year
$428
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Wood Electricity Usage Electricity Demand Electricity Fees Wood