IAC logo
IAC Assessment: UA0247
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0247
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2021
Principal Product Office Furniture
NAICS 337214 - Office Furniture (except Wood) Manufacturing
SIC 2522 - Office Furniture, Except Wood
Sales >$500,000,000
# of Employees 800
Plant Area (Sq.Ft.) 891,775
Annual Production 3,300,000 Pounds
Production Hrs. Annual 6,864
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,154,493 19,148,400 kWh $0.06
Electricity Demand $657,702 45,547 kW-months/year $14.44
Electricity Fees $(-425,891) - $ -
Natural Gas $663,691 87,815 MMBtu $7.56
TOTAL ENERGY COSTS $2,049,995
RECOMMENDED SAVINGS* $133,642 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,145
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$40,414
Cost:
$20,833
$34,141 566,280 $14,296 990 $(-8,023) - - - $34,141
566,280
kWh
$14,296
990
kW-months/year
$(-8,023)
-
$
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$314
Cost:
$705
$410 6,795 - - $(-96) - - - $410
6,795
kWh
-
-
kW-months/year
$(-96)
-
$
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,372
Cost:
$340
$5,179 85,907 $2,410 167 $(-1,217) - - - $5,179
85,907
kWh
$2,410
167
kW-months/year
$(-1,217)
-
$
-
-
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,267
Cost:
$1,000
$5,363 88,946 $8,058 558 $(-3,154) - - - $5,363
88,946
kWh
$8,058
558
kW-months/year
$(-3,154)
-
$
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$24,460
Cost:
$9,801
$31,056 515,115 $918 64 $(-7,514) - - - $31,056
515,115
kWh
$918
64
kW-months/year
$(-7,514)
-
$
-
-
MMBtu
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,313
Cost:
$459
- - - - - - $3,313 438 -
-
kWh
-
-
kW-months/year
-
-
$
$3,313
438
MMBtu
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$48,502
Cost:
$37,450
- - - - - - $48,502 6,416 -
-
kWh
-
-
kW-months/year
-
-
$
$48,502
6,416
MMBtu
TOTAL RECOMMENDED Savings:
$133,642
Cost:
$70,588
$76,149 1,263,043 $25,682 1,779 $(-20,004) - $51,815 6,854 $76,149
1,263,043
kWh
$25,682
1,779
kW-months/year
$(-20,004)
-
$
$51,815
6,854
MMBtu
TOTAL IMPLEMENTED Savings:
$34,145
Cost:
$10,600
$36,235 601,022 $3,328 231 $(-8,731) - $3,313 438 $36,235
601,022
kWh
$3,328
231
kW-months/year
$(-8,731)
-
$
$3,313
438
MMBtu