Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2022
Principal Product Tractor Attachments
NAICS 333111 - Farm Machinery and Equipment Manufacturing
SIC 3523 - Farm Machinery And Equipment
Sales $50,000,000-$100,000,000
# of Employees 490
Plant Area (Sq.Ft.) 530,000
Annual Production 20,000 Units
Production Hrs. Annual 7,344
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $431,904 7,415,590 kWh $0.06
Electricity Demand $74,475 18,121 kW-months/year $4.11
Electricity Fees $15,645 - $ -
Natural Gas $578,789 62,085 MMBtu $9.32
LPG $25,143 1,734 MMBtu $14.50
TOTAL ENERGY COSTS $1,125,956
RECOMMENDED SAVINGS* $50,218 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,218
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$32,927
Cost:
$257
$31,940 548,421 - - $987 - - - $31,940
548,421
kWh
-
-
kW-months/year
$987
-
$
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,634
Cost:
$850
$3,180 54,604 $345 84 $109 - - - $3,180
54,604
kWh
$345
84
kW-months/year
$109
-
$
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$13,657
Cost:
$8,080
- - - - - - $13,657 1,465 -
-
kWh
-
-
kW-months/year
-
-
$
$13,657
1,465
MMBtu
TOTAL RECOMMENDED Savings:
$50,218
Cost:
$9,187
$35,120 603,025 $345 84 $1,096 - $13,657 1,465 $35,120
603,025
kWh
$345
84
kW-months/year
$1,096
-
$
$13,657
1,465
MMBtu
TOTAL IMPLEMENTED Savings:
$50,218
Cost:
$9,187
$35,120 603,025 $345 84 $1,096 - $13,657 1,465 $35,120
603,025
kWh
$345
84
kW-months/year
$1,096
-
$
$13,657
1,465
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas