IAC logo
IAC Assessment: UA0258
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0258
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2022
Principal Product Automotive Interior Trim
NAICS 336360 - Motor Vehicle Seating and Interior Trim Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 92
Plant Area (Sq.Ft.) 144,495
Annual Production 70,000 Units
Production Hrs. Annual 6,240
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $417,313 6,965,023 kWh $0.06
Electricity Demand $82,948 17,158 kW-months/year $4.83
Electricity Fees $68,223 - $ -
Natural Gas $3,078 240 MMBtu $12.83
TOTAL ENERGY COSTS $571,562
RECOMMENDED SAVINGS* $14,346 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,411
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,172
Cost:
$1,000
$1,586 26,480 $325 67 $261 - $1,586
26,480
kWh
$325
67
kW-months/year
$261
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,325
Cost:
$2,961
$1,843 30,776 $203 42 $279 - $1,843
30,776
kWh
$203
42
kW-months/year
$279
-
$
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$2,610
Cost:
$7,484
$2,259 37,709 $38 8 $313 - $2,259
37,709
kWh
$38
8
kW-months/year
$313
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,159
Cost:
$787
$2,305 38,474 $475 98 $379 - $2,305
38,474
kWh
$475
98
kW-months/year
$379
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,324
Cost:
$2,000
$2,045 34,137 - - $279 - $2,045
34,137
kWh
-
-
kW-months/year
$279
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,756
Cost:
$3,299
$1,545 25,789 - - $211 - $1,545
25,789
kWh
-
-
kW-months/year
$211
-
$
TOTAL RECOMMENDED Savings:
$14,346
Cost:
$17,531
$11,583 193,365 $1,041 215 $1,722 - $11,583
193,365
kWh
$1,041
215
kW-months/year
$1,722
-
$
TOTAL IMPLEMENTED Savings:
$9,411
Cost:
$7,086
$7,481 124,880 $800 165 $1,130 - $7,481
124,880
kWh
$800
165
kW-months/year
$1,130
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees