IAC Assessment: UA0267
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0267
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2022
Principal Product Organic Bread
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $5,000,000-$10,000,000
# of Employees 170
Plant Area (Sq.Ft.) 100,000
Annual Production 47,000,000 Units
Production Hrs. Annual 8,736
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $312,109 5,343,000 kWh $0.06
Electricity Demand $42,645 9,212 kW-months/year $4.63
Electricity Fees $42,482 - $ -
Natural Gas $351,471 27,075 MMBtu $12.98
TOTAL ENERGY COSTS $748,707
RECOMMENDED SAVINGS* $25,712 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,664
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$13,660
Cost:
$51,749
$11,001 188,366 $1,198 259 $1,461 - $11,001
188,366
kWh
$1,198
259
kW-months/year
$1,461
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,033
Cost:
$1,000
$4,193 71,792 $1,195 258 $645 - $4,193
71,792
kWh
$1,195
258
kW-months/year
$645
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,954
Cost:
$1,360
$2,638 45,166 - - $316 - $2,638
45,166
kWh
-
-
kW-months/year
$316
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,388
Cost:
$1,682
- - - - $2,388 - -
-
kWh
-
-
kW-months/year
$2,388
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$677
Cost:
$901
$605 10,353 - - $72 - $605
10,353
kWh
-
-
kW-months/year
$72
-
$
TOTAL RECOMMENDED Savings:
$25,712
Cost:
$56,692
$18,437 315,677 $2,393 517 $4,882 - $18,437
315,677
kWh
$2,393
517
kW-months/year
$4,882
-
$
TOTAL IMPLEMENTED Savings:
$9,664
Cost:
$3,261
$7,436 127,311 $1,195 258 $1,033 - $7,436
127,311
kWh
$1,195
258
kW-months/year
$1,033
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees