IAC logo
IAC Assessment: UA0279
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0279
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2023
Principal Product Poultry Based Ingredients
NAICS 311615 - Poultry Processing
SIC 2015 - Poultry Slaughtering And Processing
Sales $50,000,000-$100,000,000
# of Employees 130
Plant Area (Sq.Ft.) 117,500
Annual Production 270,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,207,821 12,578,029 kWh $0.10
Natural Gas $1,956,964 298,448 MMBtu $6.56
TOTAL ENERGY COSTS $3,164,785
RECOMMENDED SAVINGS* $219,393 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,228
Cost:
$2,262
$1,228 12,789 - - - - $1,228
12,789
kWh
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$21,676
Cost:
$8,591
$21,676 225,794 - - - - $21,676
225,794
kWh
-
-
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$15,760
Cost:
$1,000
$15,760 163,232 - - - - $15,760
163,232
kWh
-
-
MMBtu
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,760
Cost:
$1,407
$3,760 39,175 - - - - $3,760
39,175
kWh
-
-
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,977
Cost:
$7,874
$1,977 20,589 - - - - $1,977
20,589
kWh
-
-
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,016
Cost:
$384
$10,016 104,336 - - - - $10,016
104,336
kWh
-
-
MMBtu
-
-
$
07: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$161,801
Cost:
$1,711,707
$142,733 1,486,800 $54,156 8,256 $(-35,088) - $142,733
1,486,800
kWh
$54,156
8,256
MMBtu
$(-35,088)
-
$
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,175
Cost:
$54,709
- - $3,175 484 - - -
-
kWh
$3,175
484
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$219,393
Cost:
$1,787,934
$197,150 2,052,715 $57,331 8,740 $(-35,088) - $197,150
2,052,715
kWh
$57,331
8,740
MMBtu
$(-35,088)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes