IAC logo
IAC Assessment: UA3018
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA3018
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2012
Principal Product Tissue Paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $100,000,000-$500,000,000
# of Employees 550
Plant Area (Sq.Ft.) 1,600,000
Annual Production 173,000 Tons
Production Hrs. Annual 8,760
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $21,753,855 483,419,000 kWh $0.05
TOTAL ENERGY COSTS $21,753,855
RECOMMENDED SAVINGS* $363,195 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,623
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$20,245
Cost:
$6,500
$20,245 449,900 $20,245
449,900
kWh
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$13,071
Cost:
$100
$13,071 290,478 $13,071
290,478
kWh
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$27,378
Cost:
$7,500
$27,378 608,416 $27,378
608,416
kWh
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$12,992
Cost:
$200
$12,992 288,706 $12,992
288,706
kWh
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$25,349
Cost:
$2,000
$25,349 564,312 $25,349
564,312
kWh
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$174,953
Cost:
$5,600
$174,953 3,287,854 $174,953
3,287,854
kWh
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$89,207
Cost:
$13,695
$89,207 1,982,371 $89,207
1,982,371
kWh
TOTAL RECOMMENDED Savings:
$363,195
Cost:
$35,595
$363,195 7,472,037 $363,195
7,472,037
kWh
TOTAL IMPLEMENTED Savings:
$47,623
Cost:
$14,000
$47,623 1,058,316 $47,623
1,058,316
kWh