IAC logo
IAC Assessment: UC2203
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2203
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2022
Principal Product Cables and wires
NAICS 335929 - Other Communication and Energy Wire Manufacturing
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 680,000
Annual Production 100,000,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $937,733 11,788,800 kWh $0.08
Electricity Demand $460,435 24,336 kW-months/year $18.92
Electricity Fees $27,326 - $ -
Natural Gas $504,050 47,756 MMBtu $10.55
TOTAL ENERGY COSTS $1,929,544
RECOMMENDED SAVINGS* $897,946 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$13,662
Cost:
$9,582
- - - - $13,662 1,295 - - -
-
kWh
-
-
kW-months/year
$13,662
1,295
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,020
Cost:
$7,066
- - - - $4,020 381 - - -
-
kWh
-
-
kW-months/year
$4,020
381
MMBtu
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$35,091
Cost:
$2,940
$26,464 332,880 $8,628 456 - - - - $26,464
332,880
kWh
$8,628
456
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$22,048
Cost:
$108,454
$11,082 139,400 $3,613 191 - - $7,353 - $11,082
139,400
kWh
$3,613
191
kW-months/year
-
-
MMBtu
$7,353
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$8,677
Cost:
$960
- - - - $8,677 823 - - -
-
kWh
-
-
kW-months/year
$8,677
823
MMBtu
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,588
Cost:
$4,500
$7,588 95,441 - - - - - - $7,588
95,441
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$806,860
Cost:
$4,875,813
$512,640 6,448,296 $376,432 19,896 - - $(-82,212) - $512,640
6,448,296
kWh
$376,432
19,896
kW-months/year
-
-
MMBtu
$(-82,212)
-
$
TOTAL RECOMMENDED Savings:
$897,946
Cost:
$5,009,315
$557,774 7,016,017 $388,673 20,543 $26,359 2,499 $(-74,859) - $557,774
7,016,017
kWh
$388,673
20,543
kW-months/year
$26,359
2,499
MMBtu
$(-74,859)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes