Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2023
Principal Product Custom plastic injection molding
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 100,000
Annual Production 20,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $262,183 2,077,208 kWh $0.13
Electricity Demand $122,253 8,382 kW-months/year $14.58
Electricity Fees $17,951 - $ -
Natural Gas $20,784 1,669 MMBtu $12.45
TOTAL ENERGY COSTS $423,171
RECOMMENDED SAVINGS* $17,701 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$275
Cost:
-
- - - - $275 - - - -
-
kWh
-
-
kW-months/year
$275
-
$
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,527
Cost:
$1,500
$4,527 35,873 - - - - - - $4,527
35,873
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,066
Cost:
$3,500
$1,066 8,447 - - - - - - $1,066
8,447
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$732
Cost:
$428
$632 5,005 $100 7 - - - - $632
5,005
kWh
$100
7
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$873
Cost:
$1,300
$754 5,973 $119 8 - - - - $754
5,973
kWh
$119
8
kW-months/year
-
-
$
-
-
MMBtu
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$251
Cost:
$50
$251 1,989 - - - - - - $251
1,989
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,805
Cost:
$75
$1,559 12,351 $247 17 - - - - $1,559
12,351
kWh
$247
17
kW-months/year
-
-
$
-
-
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,884
Cost:
$16,157
$2,490 19,730 $394 27 - - - - $2,490
19,730
kWh
$394
27
kW-months/year
-
-
$
-
-
MMBtu
09: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$4,673
Cost:
$19,488
$2,852 22,600 $451 31 - - $1,370 110 $2,852
22,600
kWh
$451
31
kW-months/year
-
-
$
$1,370
110
MMBtu
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$615
Cost:
$1,053
$92 728 - - - - $523 42 $92
728
kWh
-
-
kW-months/year
-
-
$
$523
42
MMBtu
TOTAL RECOMMENDED Savings:
$17,701
Cost:
$43,551
$14,222 112,697 $1,311 90 $275 - $1,892 152 $14,222
112,697
kWh
$1,311
90
kW-months/year
$275
-
$
$1,892
152
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas