IAC Assessment: UC2317
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2317
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2023
Principal Product Extrusion Machines
NAICS 333249 - Other Industrial Machinery Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $100,000,000-$500,000,000
# of Employees 465
Plant Area (Sq.Ft.) 300,000
Annual Production 200,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $441,332 3,639,740 kWh $0.12
Electricity Demand $295,135 10,846 kW-months/year $27.21
Electricity Fees $(-13,362) - $ -
Natural Gas $207,914 18,992 MMBtu $10.95
LPG $20,070 489 MMBtu $41.07
TOTAL ENERGY COSTS $951,089
RECOMMENDED SAVINGS* $472,960 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Primary Raw Material One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$90,350
Cost:
$29,189
- - - - - - - - $90,350 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$90,350
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$392
Cost:
$75
$300 2,473 $92 3 - - - - - - $300
2,473
kWh
$92
3
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,123
Cost:
$428
$823 7,081 $300 10 - - - - - - $823
7,081
kWh
$300
10
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,584
Cost:
$1,300
$1,211 9,991 $372 14 - - - - - - $1,211
9,991
kWh
$372
14
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,240
Cost:
$50
$5,240 43,212 - - - - - - - - $5,240
43,212
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$714
Cost:
$540
- - - - $714 65 - - - - -
-
kWh
-
-
kW-months/year
$714
65
MMBtu
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,763
Cost:
$17,190
$5,938 48,972 $1,825 67 - - - - - - $5,938
48,972
kWh
$1,825
67
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,409
Cost:
$34,609
$(-275) (-2,271) $(-85) (-3) $1,769 162 - - - - $(-275)
(-2,271)
kWh
$(-85)
(-3)
kW-months/year
$1,769
162
MMBtu
-
-
$
-
-
$
09: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$30,659
Cost:
$188,853
$(-380) (-3,132) $(-117) (-4) - - $31,155 - - - $(-380)
(-3,132)
kWh
$(-117)
(-4)
kW-months/year
-
-
MMBtu
$31,155
-
$
-
-
$
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,903
Cost:
$1,468
$852 7,020 - - $6,052 553 - - - - $852
7,020
kWh
-
-
kW-months/year
$6,052
553
MMBtu
-
-
$
-
-
$
11: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$321,413
Cost:
$2,701,940
$321,413 2,649,734 - - - - - - - - $321,413
2,649,734
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
12: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$5,411
Cost:
-
- - - - - - - - $5,411 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$5,411
-
$
TOTAL RECOMMENDED Savings:
$472,960
Cost:
$2,975,642
$335,121 2,763,080 $2,389 86 $8,535 780 $31,155 - $95,761 - $335,121
2,763,080
kWh
$2,389
86
kW-months/year
$8,535
780
MMBtu
$31,155
-
$
$95,761
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Primary Raw Material One-time Revenue or Avoided Cost