IAC logo
IAC Assessment: UC2402
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2402
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2024
Principal Product Rubber product
NAICS 326299 - All Other Rubber Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 21,000
Annual Production 20,000,000 Pounds
Production Hrs. Annual 2,500
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,540 481,601 kWh $0.12
Electricity Demand $53,548 2,217 kW-months/year $24.15
Electricity Fees $9,262 - $ -
Natural Gas $31,271 2,820 MMBtu $11.09
TOTAL ENERGY COSTS $151,620
RECOMMENDED SAVINGS* $45,065 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$17,049
Cost:
$134,289
$17,049 142,666 - - - - - - $17,049
142,666
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$7,849
Cost:
$31,027
$(-611) (-5,111) $8,694 360 - - $(-234) - $(-611)
(-5,111)
kWh
$8,694
360
kW-months/year
-
-
MMBtu
$(-234)
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,298
Cost:
$3,327
- - - - $1,298 117 - - -
-
kWh
-
-
kW-months/year
$1,298
117
MMBtu
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,943
Cost:
$1,040
$2,363 19,778 $579 24 - - - - $2,363
19,778
kWh
$579
24
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,261
Cost:
$150
$1,770 14,809 $491 20 - - - - $1,770
14,809
kWh
$491
20
kW-months/year
-
-
MMBtu
-
-
$
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$4,612
Cost:
$30
$4,612 38,593 - - - - - - $4,612
38,593
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$419
Cost:
$1,300
$328 2,744 $91 4 - - - - $328
2,744
kWh
$91
4
kW-months/year
-
-
MMBtu
-
-
$
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,934
Cost:
$155
$1,934 16,187 - - - - - - $1,934
16,187
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$6,701
Cost:
$64,088
$13,928 116,550 $4,999 207 $(-12,226) (-1,102) - - $13,928
116,550
kWh
$4,999
207
kW-months/year
$(-12,226)
(-1,102)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$45,065
Cost:
$235,406
$41,373 346,216 $14,854 615 $(-10,928) (-985) $(-234) - $41,373
346,216
kWh
$14,854
615
kW-months/year
$(-10,928)
(-985)
MMBtu
$(-234)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost