IAC Assessment: UC2407
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2407
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2024
Principal Product Specialty gas cylinders
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $50,000,000-$100,000,000
# of Employees 110
Plant Area (Sq.Ft.) 76,000
Annual Production 100,000 Units
Production Hrs. Annual 3,250
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $506,033 5,665,800 kWh $0.09
Electricity Demand $211,723 11,239 kW-months/year $18.84
Electricity Fees $131,064 - $ -
Natural Gas $422,661 28,074 MMBtu $15.06
Other Gas $252,882 1,916 MMBtu $132.01
TOTAL ENERGY COSTS $1,524,363
RECOMMENDED SAVINGS* $183,498 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,850
Cost:
-
- - - - $2,850 - - - -
-
kWh
-
-
kW-months/year
$2,850
-
$
-
-
MMBtu
02: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$208
Cost:
-
- - - - $208 - - - -
-
kWh
-
-
kW-months/year
$208
-
$
-
-
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$123
Cost:
$139
- - - - - - $123 8 -
-
kWh
-
-
kW-months/year
-
-
$
$123
8
MMBtu
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,157
Cost:
$100
$1,157 12,956 - - - - - - $1,157
12,956
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$504
Cost:
$75
$392 4,356 $112 6 - - - - $392
4,356
kWh
$112
6
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$588
Cost:
$1,300
$456 5,110 $132 7 - - - - $456
5,110
kWh
$132
7
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,041
Cost:
$5,000
$3,135 35,109 $906 48 - - - - $3,135
35,109
kWh
$906
48
kW-months/year
-
-
$
-
-
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$115,385
Cost:
$54,067
$115,385 1,292,100 - - - - - - $115,385
1,292,100
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$58,641
Cost:
$633,762
$58,641 656,678 - - - - - - $58,641
656,678
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$183,498
Cost:
$694,443
$179,166 2,006,308 $1,150 61 $3,058 - $123 8 $179,166
2,006,308
kWh
$1,150
61
kW-months/year
$3,058
-
$
$123
8
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas