Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2024
Principal Product Machined parts
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 16
Plant Area (Sq.Ft.) 12,500
Annual Production 50,000 Units
Production Hrs. Annual 6,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,442 541,597 kWh $0.09
Electricity Demand $70,249 1,688 kW-months/year $41.61
Electricity Fees $2,839 - $ -
Fuel Oil #2 $6,609 236 MMBtu $27.97
TOTAL ENERGY COSTS $130,138
RECOMMENDED SAVINGS* $14,623 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$829
Cost:
-
- - - - $829 - - - - - -
-
kWh
-
-
kW-months/year
$829
-
$
-
-
MMBtu
-
-
MMBtu
02: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$614
Cost:
-
- - - - $614 - - - - - -
-
kWh
-
-
kW-months/year
$614
-
$
-
-
MMBtu
-
-
MMBtu
03: 2.7493 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES Savings:
$1,916
Cost:
$36,122
$164 1,765 - - - - - - $1,751 63 $164
1,765
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,751
63
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$972
Cost:
$75
$517 5,549 $455 11 - - - - - - $517
5,549
kWh
$455
11
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,166
Cost:
$2,183
$58 624 - - - - - - $1,108 40 $58
624
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,108
40
MMBtu
06: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$4,482
Cost:
$16,784
- - - - - - $(-2,128) (-199) $6,610 236 -
-
kWh
-
-
kW-months/year
-
-
$
$(-2,128)
(-199)
MMBtu
$6,610
236
MMBtu
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$4,645
Cost:
$32,845
$(-1,218) (-13,083) $(-746) (-18) - - - - $6,609 236 $(-1,218)
(-13,083)
kWh
$(-746)
(-18)
kW-months/year
-
-
$
-
-
MMBtu
$6,609
236
MMBtu
TOTAL RECOMMENDED Savings:
$14,623
Cost:
$88,009
$(-479) (-5,144) $(-290) (-7) $1,443 - $(-2,128) (-199) $16,077 575 $(-479)
(-5,144)
kWh
$(-290)
(-7)
kW-months/year
$1,443
-
$
$(-2,128)
(-199)
MMBtu
$16,077
575
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2