Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Connecticut |
---|---|
Assessment Year | 2024 |
Principal Product | Machined parts |
NAICS | 332710 - Machine Shops |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 16 |
Plant Area (Sq.Ft.) | 12,500 |
Annual Production | 50,000 Units |
Production Hrs. Annual | 6,000 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $50,442 | 541,597 | kWh | $0.09 |
Electricity Demand | $70,249 | 1,688 | kW-months/year | $41.61 |
Electricity Fees | $2,839 | - | $ | - |
Fuel Oil #2 | $6,609 | 236 | MMBtu | $27.97 |
TOTAL ENERGY COSTS | $130,138 | |||
RECOMMENDED SAVINGS* | $14,623 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Fuel Oil #2 | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $829 Cost: - |
- | - | - | - | $829 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$829 - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS |
Savings: $614 Cost: - |
- | - | - | - | $614 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$614 - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7493 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES |
Savings: $1,916 Cost: $36,122 |
$164 | 1,765 | - | - | - | - | - | - | $1,751 | 63 |
$164 1,765 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$1,751 63 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $972 Cost: $75 |
$517 | 5,549 | $455 | 11 | - | - | - | - | - | - |
$517 5,549 kWh |
$455 11 kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,166 Cost: $2,183 |
$58 | 624 | - | - | - | - | - | - | $1,108 | 40 |
$58 624 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$1,108 40 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $4,482 Cost: $16,784 |
- | - | - | - | - | - | $(-2,128) | (-199) | $6,610 | 236 |
- - kWh |
- - kW-months/year |
- - $ |
$(-2,128) (-199) MMBtu |
$6,610 236 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $4,645 Cost: $32,845 |
$(-1,218) | (-13,083) | $(-746) | (-18) | - | - | - | - | $6,609 | 236 |
$(-1,218) (-13,083) kWh |
$(-746) (-18) kW-months/year |
- - $ |
- - MMBtu |
$6,609 236 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,623 Cost: $88,009 |
$(-479) | (-5,144) | $(-290) | (-7) | $1,443 | - | $(-2,128) | (-199) | $16,077 | 575 | $(-479) (-5,144) kWh |
$(-290) (-7) kW-months/year |
$1,443 - $ |
$(-2,128) (-199) MMBtu |
$16,077 575 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Fuel Oil #2 | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Fuel Oil #2 |