IAC Assessment: UC2503
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2503
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2024
Principal Product Electric Lighting Fixtures
NAICS 335122 - Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
SIC 3646 - Commercial Lighting Fixtures
Sales $10,000,000-$50,000,000
# of Employees 107
Plant Area (Sq.Ft.) 155,000
Annual Production 100,000 Pieces
Production Hrs. Annual 2,125
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,272 438,861 kWh $0.15
Electricity Demand $60,141 3,925 kW-months/year $15.32
Electricity Fees $1,025 - $ -
LPG $55,031 3,974 MMBtu $13.85
Fuel Oil #2 $34,778 1,440 MMBtu $24.14
TOTAL ENERGY COSTS $215,246
RECOMMENDED SAVINGS* $48,513 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$115
Cost:
-
- - - - $115 - - - -
-
kWh
-
-
kW-months/year
$115
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,774
Cost:
-
- - - - $3,774 - - - -
-
kWh
-
-
kW-months/year
$3,774
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,369
Cost:
$18,244
$4,731 32,292 $2,638 172 - - - - $4,731
32,292
kWh
$2,638
172
kW-months/year
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,976
Cost:
$75
$2,553 17,428 $1,423 93 - - - - $2,553
17,428
kWh
$1,423
93
kW-months/year
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,078
Cost:
$1,600
$10,322 70,454 $5,757 376 - - - - $10,322
70,454
kWh
$5,757
376
kW-months/year
-
-
$
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$15,917
Cost:
$51,000
$10,218 69,750 $5,699 372 - - - - $10,218
69,750
kWh
$5,699
372
kW-months/year
-
-
$
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$531
Cost:
$2,870
$531 3,627 - - - - - - $531
3,627
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$751
Cost:
$435
$724 4,941 - - - - $27 - $724
4,941
kWh
-
-
kW-months/year
-
-
$
$27
-
$
TOTAL RECOMMENDED Savings:
$48,513
Cost:
$74,224
$29,079 198,491 $15,517 1,013 $3,889 - $27 - $29,079
198,491
kWh
$15,517
1,013
kW-months/year
$3,889
-
$
$27
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost