IAC Assessment: UC2504
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2504
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2024
Principal Product Metal Casting
NAICS 331511 - Iron Foundries
SIC 3322 - Malleable Iron Foundries
Sales $10,000,000-$50,000,000
# of Employees 62
Plant Area (Sq.Ft.) 80,000
Annual Production 580,000 Pieces
Production Hrs. Annual 6,375
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,323,744 12,345,481 kWh $0.11
Electricity Demand $744,792 66,028 kW-months/year $11.28
Electricity Fees $(-333,049) - $ -
LPG $402,323 28,521 MMBtu $14.11
TOTAL ENERGY COSTS $2,137,810
RECOMMENDED SAVINGS* $313,772 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Ancillary Material Cost Electricity Usage Electricity Demand LPG Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$19,657
Cost:
$60
$19,657 183,370 - - - - - - $19,657
183,370
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$33,264
Cost:
$60
$33,264 310,302 - - - - - - $33,264
310,302
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,622
Cost:
$1,600
$4,039 37,680 $582 52 - - - - $4,039
37,680
kWh
$582
52
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$21,015
Cost:
$1,166
$2,953 27,547 - - $18,062 1,280 - - $2,953
27,547
kWh
-
-
kW-months/year
$18,062
1,280
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,212
Cost:
$2,686
$2,807 26,185 $405 36 - - - - $2,807
26,185
kWh
$405
36
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$8,677
Cost:
-
- - - - $8,677 615 - - -
-
kWh
-
-
kW-months/year
$8,677
615
MMBtu
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$223,326
Cost:
$1,974,272
$254,961 2,378,366 - - - - $(-31,635) - $254,961
2,378,366
kWh
-
-
kW-months/year
-
-
MMBtu
$(-31,635)
-
$
TOTAL RECOMMENDED Savings:
$313,772
Cost:
$1,979,844
$317,682 2,963,450 $987 87 $26,739 1,895 $(-31,635) - $317,682
2,963,450
kWh
$987
87
kW-months/year
$26,739
1,895
MMBtu
$(-31,635)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand LPG Ancillary Material Cost Electricity Usage Electricity Demand LPG Ancillary Material Cost