Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2024
Principal Product Precision plating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 113
Plant Area (Sq.Ft.) 92,856
Annual Production 81,550,000 Units
Production Hrs. Annual 6,240
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $612,568 8,140,347 kWh $0.08
Electricity Demand $112,369 13,972 kW-months/year $8.04
Electricity Fees $4,635 - $ -
Natural Gas $288,043 59,951 MMBtu $4.80
TOTAL ENERGY COSTS $1,017,615
RECOMMENDED SAVINGS* $48,163 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$984
Cost:
-
- - - - $984 - - - -
-
kWh
-
-
kW-months/year
$984
-
$
-
-
$
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$26,200
Cost:
$343,027
$32,272 403,397 - - - - $(-6,072) - $32,272
403,397
kWh
-
-
kW-months/year
-
-
$
$(-6,072)
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,144
Cost:
$1,950
$3,642 45,531 $501 62 - - - - $3,642
45,531
kWh
$501
62
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$273
Cost:
$113
$240 3,004 $33 4 - - - - $240
3,004
kWh
$33
4
kW-months/year
-
-
$
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$7,585
Cost:
$50
$7,585 94,813 - - - - - - $7,585
94,813
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$8,976
Cost:
$24,000
$7,827 97,843 $1,149 143 - - - - $7,827
97,843
kWh
$1,149
143
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$48,163
Cost:
$369,140
$51,567 644,588 $1,683 209 $984 - $(-6,072) - $51,567
644,588
kWh
$1,683
209
kW-months/year
$984
-
$
$(-6,072)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost