Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Connecticut |
---|---|
Assessment Year | 2025 |
Principal Product | Engineered Fasteners |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3492 - Fluid Power Valves & Hose Fittings |
Sales | $100,000,000-$500,000,000 |
# of Employees | 316 |
Plant Area (Sq.Ft.) | 49,533 |
Annual Production | 8,289 Units |
Production Hrs. Annual | 6,000 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $363,530 | 3,052,800 | kWh | $0.12 |
Electricity Demand | $151,561 | 7,375 | kW-months/year | $20.55 |
Natural Gas | $453,511 | 32,342 | MMBtu | $14.02 |
TOTAL ENERGY COSTS | $968,601 | |||
RECOMMENDED SAVINGS* | $397,898 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,109 Cost: $1,474 |
$6,950 | 58,355 | $159 | 8 | - | - | - | - |
$6,950 58,355 kWh |
$159 8 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,290 Cost: $2,200 |
$1,904 | 15,985 | $386 | 19 | - | - | - | - |
$1,904 15,985 kWh |
$386 19 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $6,520 Cost: $10,625 |
$6,316 | 52,716 | $205 | 10 | - | - | - | - |
$6,316 52,716 kWh |
$205 10 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $6,789 Cost: $14,000 |
$6,621 | 55,265 | $168 | 8 | - | - | - | - |
$6,621 55,265 kWh |
$168 8 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $22,999 Cost: $8,485 |
- | - | - | - | $22,999 | 1,640 | - | - |
- - kWh |
- - kW-months/year |
$22,999 1,640 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,267 Cost: $2,180 |
- | - | - | - | $3,267 | 233 | - | - |
- - kWh |
- - kW-months/year |
$3,267 233 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $225,469 Cost: $2,423,010 |
$225,469 | 1,893,107 | - | - | - | - | - | - |
$225,469 1,893,107 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $6,726 Cost: $75 |
$6,726 | 56,469 | - | - | - | - | - | - |
$6,726 56,469 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $116,730 Cost: $360,000 |
$(-43,560) | (-365,740) | - | - | $152,348 | 10,867 | $7,941 | 1,059 |
$(-43,560) (-365,740) kWh |
- - kW-months/year |
$152,348 10,867 MMBtu |
$7,941 1,059 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $397,898 Cost: $2,822,049 |
$210,425 | 1,766,157 | $918 | 45 | $178,615 | 12,740 | $7,941 | 1,059 | $210,425 1,766,157 kWh |
$918 45 kW-months/year |
$178,615 12,740 MMBtu |
$7,941 1,059 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Natural Gas | Water Usage |