Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1984 |
Principal Product | LUMBER-SAWMILL OPERATION |
NAICS | n/a |
SIC | 2426 - Hardwood Dimension & Flooring Mills |
Sales | $1,000,000-$5,000,000 |
# of Employees | 53 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 2,490 Thousand Feet |
Production Hrs. Annual | 0 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $50,500 | 1,000,000 | kWh | $0.05 |
Natural Gas | $2,486 | 430 | MMBtu | $5.78 |
Wood | $38,400 | 33,024 | MMBtu | $1.16 |
Other Energy | $161,606 | 42,530 | MMBtu | $3.80 |
TOTAL ENERGY COSTS | $252,992 | |||
RECOMMENDED SAVINGS* | $31,945 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,383 |
#|Description |
Savings Cost |
Status | Electricity Usage | Wood | Other Energy | Electricity Usage | Wood | Other Energy | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $5,281 Cost: $5,000 |
- | - | - | - | $5,281 | 1,620 |
- - kWh |
- - MMBtu |
$5,281 1,620 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $19,560 Cost: $40,500 |
- | - | - | - | $19,560 | 6,000 |
- - kWh |
- - MMBtu |
$19,560 6,000 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $1,754 Cost: $1,271 |
$1,754 | 38,687 | - | - | - | - |
$1,754 38,687 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1392 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE |
Savings: $3,629 Cost: $6,000 |
- | - | $(-5,760) | (-4,608) | $9,389 | 2,880 |
- - kWh |
$(-5,760) (-4,608) MMBtu |
$9,389 2,880 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2191 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM |
Savings: $1,721 Cost: $3,000 |
- | - | - | - | $1,721 | 528 |
- - kWh |
- - MMBtu |
$1,721 528 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $31,945 Cost: $55,771 |
$1,754 | 38,687 | $(-5,760) | (-4,608) | $35,951 | 11,028 | $1,754 38,687 kWh |
$(-5,760) (-4,608) MMBtu |
$35,951 11,028 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,383 Cost: $7,271 |
$1,754 | 38,687 | $(-5,760) | (-4,608) | $9,389 | 2,880 | $1,754 38,687 kWh |
$(-5,760) (-4,608) MMBtu |
$9,389 2,880 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Wood | Other Energy | Electricity Usage | Wood | Other Energy |