IAC logo
IAC Assessment: UD0283
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0283
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1989
Principal Product CIRCUIT BOARDS
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 500,000 Pieces
Production Hrs. Annual 2,250
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,418 1,337,046 kWh $0.07
Fuel Oil #2 $4,854 980 MMBtu $4.95
TOTAL ENERGY COSTS $92,272
RECOMMENDED SAVINGS* $8,278 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,278
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,105
Cost:
$2,000
$1,105 - - - - - $1,105
-
kWh
-
-
MMBtu
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,833
Cost:
$3,000
$7,225 61,254 $(-1,392) (-280) - - $7,225
61,254
kWh
$(-1,392)
(-280)
MMBtu
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$738
Cost:
-
$696 9,379 - - $42 - $696
9,379
kWh
-
-
MMBtu
$42
-
$
04: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$602
Cost:
$400
$522 21,395 - - $80 - $522
21,395
kWh
-
-
MMBtu
$80
-
$
TOTAL RECOMMENDED Savings:
$8,278
Cost:
$5,400
$9,548 92,028 $(-1,392) (-280) $122 - $9,548
92,028
kWh
$(-1,392)
(-280)
MMBtu
$122
-
$
TOTAL IMPLEMENTED Savings:
$8,278
Cost:
$5,400
$9,548 92,028 $(-1,392) (-280) $122 - $9,548
92,028
kWh
$(-1,392)
(-280)
MMBtu
$122
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes