IAC logo
IAC Assessment: UD0290
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0290
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1989
Principal Product WELDERS,AIRCRFT GRD POWER
NAICS n/a
SIC 3548 - Welding Apparatus
Sales $10,000,000-$50,000,000
# of Employees 393
Plant Area (Sq.Ft.) 0
Annual Production 40,000 Pieces
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $480,398 8,950,762 kWh $0.05
Natural Gas $205,075 49,655 MMBtu $4.13
TOTAL ENERGY COSTS $685,473
RECOMMENDED SAVINGS* $40,414 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,721
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$2,104
Cost:
$1,000
- - $2,104 - - - -
-
kWh
$2,104
-
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,658
Cost:
$8,000
- - $5,658 1,380 - - -
-
kWh
$5,658
1,380
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,035
Cost:
$3,000
- - $2,035 496 - - -
-
kWh
$2,035
496
MMBtu
-
-
$
04: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$6,394
Cost:
$11,600
$6,861 101,114 $(-870) (-212) $403 - $6,861
101,114
kWh
$(-870)
(-212)
MMBtu
$403
-
$
05: 2.7421 REDUCE GLAZED AREAS IN BUILDINGS Savings:
$22,077
Cost:
$21,750
- - $22,077 5,390 - - -
-
kWh
$22,077
5,390
MMBtu
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,146
Cost:
$465
$2,034 30,774 - - $112 - $2,034
30,774
kWh
-
-
MMBtu
$112
-
$
TOTAL RECOMMENDED Savings:
$40,414
Cost:
$45,815
$8,895 131,888 $31,004 7,054 $515 - $8,895
131,888
kWh
$31,004
7,054
MMBtu
$515
-
$
TOTAL IMPLEMENTED Savings:
$32,721
Cost:
$34,815
$8,895 131,888 $23,311 5,178 $515 - $8,895
131,888
kWh
$23,311
5,178
MMBtu
$515
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes