IAC logo
IAC Assessment: UD0309
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0309
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1990
Principal Product PRINTED MATERIALS
NAICS n/a
SIC 2721 - Periodicals
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $306,435 5,434,936 kWh $0.06
Natural Gas $115,631 27,972 MMBtu $4.13
TOTAL ENERGY COSTS $422,066
RECOMMENDED SAVINGS* $30,624 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,274
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$13,076
Cost:
$18,000
$13,076 - - - $13,076
-
kWh
-
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,951
Cost:
$700
- - $3,951 1,068 -
-
kWh
$3,951
1,068
MMBtu
03: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$1,295
Cost:
$200
- - $1,295 350 -
-
kWh
$1,295
350
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,374
Cost:
$8,000
$2,049 20,809 $1,325 358 $2,049
20,809
kWh
$1,325
358
MMBtu
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$900
Cost:
$500
$1,019 14,068 $(-119) (-32) $1,019
14,068
kWh
$(-119)
(-32)
MMBtu
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$8,028
Cost:
$10,000
$8,028 242,380 - - $8,028
242,380
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,624
Cost:
$37,400
$24,172 277,257 $6,452 1,744 $24,172
277,257
kWh
$6,452
1,744
MMBtu
TOTAL IMPLEMENTED Savings:
$13,274
Cost:
$10,900
$8,028 242,380 $5,246 1,418 $8,028
242,380
kWh
$5,246
1,418
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas