Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1999 |
Principal Product | Dispersions, emulsions, color pigments, thermoset resins |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 15,000,000 Pounds |
Production Hrs. Annual | 5,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $124,859 | 2,198,710 | kWh | $0.06 |
Electricity Demand | $99,967 | 6,660 | kW-months/year | $15.01 |
Natural Gas | $43,426 | 9,450 | MMBtu | $4.60 |
TOTAL ENERGY COSTS | $283,304 | |||
RECOMMENDED SAVINGS* | $295,158 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $43,376 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $250,000 Cost: $325,000 |
- | - | - | - | - | - | $250,000 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$250,000 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $25,726 Cost: $7,500 |
- | - | - | - | - | - | - | - | $1,163 | - | $24,563 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - $ |
$1,163 - $ |
$24,563 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $9,050 Cost: $8,000 |
$(-385) | (-7,034) | $(-1,891) | (-126) | $11,326 | 3,699,865 | - | - | - | - | - | - |
$(-385) (-7,034) kWh |
$(-1,891) (-126) kW-months/year |
$11,326 3,699,865 Tgal |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE |
Savings: $7,690 Cost: $2,850 |
$2,915 | 53,048 | $4,775 | 318 | - | - | - | - | - | - | - | - |
$2,915 53,048 kWh |
$4,775 318 kW-months/year |
- - Tgal |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $1,782 Cost: $2,000 |
$1,782 | 32,532 | - | - | - | - | - | - | - | - | - | - |
$1,782 32,532 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $910 Cost: - |
$550 | 9,965 | $360 | 24 | - | - | - | - | - | - | - | - |
$550 9,965 kWh |
$360 24 kW-months/year |
- - Tgal |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $295,158 Cost: $345,350 |
$4,862 | 88,511 | $3,244 | 216 | $11,326 | 3,699,865 | $250,000 | - | $1,163 | - | $24,563 | - | $4,862 88,511 kWh |
$3,244 216 kW-months/year |
$11,326 3,699,865 Tgal |
$250,000 - $ |
$1,163 - $ |
$24,563 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $43,376 Cost: $18,350 |
$3,080 | 55,979 | $3,244 | 216 | $11,326 | 3,699,865 | - | - | $1,163 | - | $24,563 | - | $3,080 55,979 kWh |
$3,244 216 kW-months/year |
$11,326 3,699,865 Tgal |
- - $ |
$1,163 - $ |
$24,563 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Ancillary Material Cost | Primary Product |