Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2001 |
Principal Product | Custom blow molded plastic parts |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 115 |
Plant Area (Sq.Ft.) | 85,000 |
Annual Production | 10,000,000 Pounds |
Production Hrs. Annual | 8,568 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $351,785 | 9,230,400 | kWh | $0.04 |
Electricity Demand | $175,352 | 17,448 | kW-months/year | $10.05 |
Natural Gas | $3,406 | 380 | MMBtu | $8.96 |
TOTAL ENERGY COSTS | $540,317 | |||
RECOMMENDED SAVINGS* | $65,253 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $52,076 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $22,708 Cost: $55,000 |
$15,870 | 377,849 | $6,838 | 680 | - | - |
$15,870 377,849 kWh |
$6,838 680 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $12,972 Cost: $315 |
$9,716 | 231,336 | $3,256 | 324 | - | - |
$9,716 231,336 kWh |
$3,256 324 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $10,095 Cost: $4,500 |
$7,562 | 180,050 | $2,533 | 252 | - | - |
$7,562 180,050 kWh |
$2,533 252 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,767 Cost: $13,700 |
$7,778 | 185,182 | $989 | 98 | - | - |
$7,778 185,182 kWh |
$989 98 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $5,466 Cost: $2,880 |
$4,048 | 96,390 | $1,418 | 135 | - | - |
$4,048 96,390 kWh |
$1,418 135 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE |
Savings: $3,363 Cost: $100 |
$2,519 | 59,976 | $844 | 84 | - | - |
$2,519 59,976 kWh |
$844 84 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,047 Cost: $3,000 |
$655 | 15,600 | $392 | 156 | - | - |
$655 15,600 kWh |
$392 156 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5112 REPROCESS SPENT OILS ON SITE FOR RE-USE |
Savings: $835 Cost: $3,323 |
- | - | - | - | $835 | 325 |
- - kWh |
- - kW-months/year |
$835 325 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $65,253 Cost: $82,818 |
$48,148 | 1,146,383 | $16,270 | 1,729 | $835 | 325 | $48,148 1,146,383 kWh |
$16,270 1,729 kW-months/year |
$835 325 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $52,076 Cost: $66,018 |
$37,196 | 885,625 | $14,045 | 1,391 | $835 | 325 | $37,196 885,625 kWh |
$14,045 1,391 kW-months/year |
$835 325 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Other Liquid (non-haz) |