Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2001 |
Principal Product | Automotive stampings |
NAICS | n/a |
SIC | 3469 - Metal Stampings, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 46 |
Plant Area (Sq.Ft.) | 44,360 |
Annual Production | 70,000,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $32,049 | 1,052,600 | kWh | $0.03 |
Electricity Demand | $41,877 | 5,076 | kW-months/year | $8.25 |
Natural Gas | $16,779 | 3,781 | MMBtu | $4.44 |
TOTAL ENERGY COSTS | $95,587 | |||
RECOMMENDED SAVINGS* | $34,542 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $30,810 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $11,607 Cost: $720 |
$4,380 | 146,000 | $7,227 | 876 | - | - | - | - | - | - |
$4,380 146,000 kWh |
$7,227 876 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $11,232 Cost: $5,000 |
- | - | $11,232 | 1,512 | - | - | - | - | - | - |
- - kWh |
$11,232 1,512 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $3,449 Cost: $560 |
$974 | 32,475 | $2,475 | 300 | - | - | - | - | - | - |
$974 32,475 kWh |
$2,475 300 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $3,432 Cost: $700 |
- | - | - | - | - | - | - | - | $3,432 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$3,432 - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE |
Savings: $2,639 Cost: $500 |
- | - | - | - | - | - | $2,639 | 412,951 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,639 412,951 Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,272 Cost: $88 |
$480 | 16,000 | $792 | 96 | - | - | - | - | - | - |
$480 16,000 kWh |
$792 96 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $611 Cost: $1,180 |
- | - | - | - | $611 | 70 | - | - | - | - |
- - kWh |
- - kW-months/year |
$611 70 MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $300 Cost: - |
$300 | 10,000 | - | - | - | - | - | - | - | - |
$300 10,000 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $34,542 Cost: $8,748 |
$6,134 | 204,475 | $21,726 | 2,784 | $611 | 70 | $2,639 | 412,951 | $3,432 | - | $6,134 204,475 kWh |
$21,726 2,784 kW-months/year |
$611 70 MMBtu |
$2,639 412,951 Tgal |
$3,432 - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $30,810 Cost: $8,048 |
$5,834 | 194,475 | $21,726 | 2,784 | $611 | 70 | $2,639 | 412,951 | - | - | $5,834 194,475 kWh |
$21,726 2,784 kW-months/year |
$611 70 MMBtu |
$2,639 412,951 Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) |