IAC Assessment: UD0672
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0672
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2003
Principal Product DC electric motors and injection molded parts
NAICS 335312 - Motor and Generator Manufacturing
SIC 3621 - Motors And Generators
Sales $10,000,000-$50,000,000
# of Employees 97
Plant Area (Sq.Ft.) 45,000
Annual Production 42,000 Pieces
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,496 2,137,200 kWh $0.04
Electricity Demand $39,503 5,628 kW-months/year $7.02
Natural Gas $33,305 4,467 MMBtu $7.46
TOTAL ENERGY COSTS $165,574
RECOMMENDED SAVINGS* $23,461 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,505
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$7,766
Cost:
-
- - - - $7,766 1,137 - - - - -
-
kWh
-
-
kW-months/year
$7,766
1,137
MMBtu
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,363
Cost:
$14,700
$3,788 88,100 $2,575 358 - - - - - - $3,788
88,100
kWh
$2,575
358
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,100
Cost:
$136
- - - - - - - - $2,100 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$2,100
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,720
Cost:
-
$1,290 30,000 $430 60 - - - - - - $1,290
30,000
kWh
$430
60
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,550
Cost:
$143
$1,160 27,000 $390 54 - - - - - - $1,160
27,000
kWh
$390
54
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7122 DISCONNECT BALLASTS Savings:
$963
Cost:
$323
$722 16,800 $241 34 - - - - - - $722
16,800
kWh
$241
34
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$867
Cost:
-
- - - - - - $867 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$867
-
$
-
-
$
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$815
Cost:
$218
$815 19,000 - - - - - - - - $815
19,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$495
Cost:
-
$495 11,500 - - - - - - - - $495
11,500
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$371
Cost:
$220
$371 8,600 - - - - - - - - $371
8,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$264
Cost:
$640
$144 3,360 $120 34 - - - - - - $144
3,360
kWh
$120
34
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$140
Cost:
-
$97 2,250 $43 6 - - - - - - $97
2,250
kWh
$43
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
13: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$47
Cost:
$3
$38 876 $9 1 - - - - - - $38
876
kWh
$9
1
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$23,461
Cost:
$16,383
$8,920 207,486 $3,808 547 $7,766 1,137 $867 - $2,100 - $8,920
207,486
kWh
$3,808
547
kW-months/year
$7,766
1,137
MMBtu
$867
-
$
$2,100
-
$
TOTAL IMPLEMENTED Savings:
$13,505
Cost:
$1,463
$2,879 67,036 $760 123 $7,766 1,137 - - $2,100 - $2,879
67,036
kWh
$760
123
kW-months/year
$7,766
1,137
MMBtu
-
-
$
$2,100
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost