Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2004 |
Principal Product | Punches and dies |
NAICS | 336390 - Other Motor Vehicle Parts Manufacturing |
SIC | 3569 - General Industrial Machinery, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 143,000 Pieces |
Production Hrs. Annual | 5,720 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $83,712 | 87,776 | kWh | $0.95 |
Electricity Demand | $87,776 | 6,684 | kW-months/year | $13.13 |
Natural Gas | $29,754 | 3,956 | MMBtu | $7.52 |
TOTAL ENERGY COSTS | $205,223 | |||
RECOMMENDED SAVINGS* | $52,676 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,109 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7242 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES |
Savings: $24,929 Cost: $9,930 |
$11,536 | 427,241 | - | - | $13,393 | 1,781 | - | - | - | - |
$11,536 427,241 kWh |
- - kW-months/year |
$13,393 1,781 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $9,916 Cost: $9,244 |
$9,916 | 367,259 | - | - | - | - | - | - | - | - |
$9,916 367,259 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION |
Savings: $4,576 Cost: $7,366 |
$1,026 | 38,016 | $700 | 53 | $2,850 | 379 | - | - | - | - |
$1,026 38,016 kWh |
$700 53 kW-months/year |
$2,850 379 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.5123 REDUCE FLUID FLOW RATES |
Savings: $4,171 Cost: $2,400 |
$2,039 | 75,504 | $2,132 | 161 | - | - | - | - | - | - |
$2,039 75,504 kWh |
$2,132 161 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $1,955 Cost: $5,625 |
- | - | - | - | $1,955 | 260 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,955 260 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,580 Cost: - |
$630 | 23,400 | $950 | 72 | - | - | - | - | - | - |
$630 23,400 kWh |
$950 72 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,533 Cost: $2,240 |
$1,533 | 56,784 | - | - | - | - | - | - | - | - |
$1,533 56,784 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $1,197 Cost: $86 |
$338 | 12,519 | $859 | 65 | - | - | - | - | - | - |
$338 12,519 kWh |
$859 65 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $1,085 Cost: $6 |
$534 | 19,719 | $551 | 42 | - | - | - | - | - | - |
$534 19,719 kWh |
$551 42 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4155 STANDARDIZE MOTOR INVENTORY |
Savings: $952 Cost: $340 |
- | - | - | - | - | - | $952 | 313 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$952 313 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS |
Savings: $352 Cost: - |
- | - | - | - | - | - | - | - | $352 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$352 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $430 Cost: $170 |
$150 | 5,720 | $280 | 10 | - | - | - | - | - | - |
$150 5,720 kWh |
$280 10 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $52,676 Cost: $37,407 |
$27,702 | 1,026,162 | $5,472 | 403 | $18,198 | 2,420 | $952 | 313 | $352 | - | $27,702 1,026,162 kWh |
$5,472 403 kW-months/year |
$18,198 2,420 MMBtu |
$952 313 Tgal |
$352 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,109 Cost: $9,936 |
$3,845 | 142,640 | $4,062 | 296 | $2,850 | 379 | - | - | $352 | - | $3,845 142,640 kWh |
$4,062 296 kW-months/year |
$2,850 379 MMBtu |
- - Tgal |
$352 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes |