IAC logo
IAC Assessment: UD0722
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0722
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2005
Principal Product Flat Roll Steel Coil, Sheet
NAICS 331221 - Rolled Steel Shape Manufacturing
SIC 3444 - Sheet Metalwork
Sales $100,000,000-$500,000,000
# of Employees 180
Plant Area (Sq.Ft.) 300,000
Annual Production 453,864,011 Pounds
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $188,546 2,992,960 kWh $0.06
Electricity Demand $84,128 7,092 kW-months/year $11.86
Natural Gas $55,719 6,656 MMBtu $8.37
TOTAL ENERGY COSTS $335,206
RECOMMENDED SAVINGS* $131,948 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,948
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Other Gas Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$113,700
Cost:
$454,800
- - - - $33,700 2,574 - - $80,000 - -
-
kWh
-
-
kW-months/year
$33,700
2,574
MMBtu
-
-
lb
$80,000
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,570
Cost:
$21,200
$6,570 146,000 - - - - - - - - $6,570
146,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,334
Cost:
$192
$2,349 52,200 $1,985 104 - - - - - - $2,349
52,200
kWh
$1,985
104
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,776
Cost:
$1,448
$1,088 24,184 $1,688 89 - - - - - - $1,088
24,184
kWh
$1,688
89
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,734
Cost:
$9,650
$1,206 26,800 $1,528 80 - - - - - - $1,206
26,800
kWh
$1,528
80
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$1,730
Cost:
-
- - - - - - $1,730 49,400 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,730
49,400
lb
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$104
Cost:
$102
$104 2,320 - - - - - - - - $104
2,320
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$131,948
Cost:
$487,392
$11,317 251,504 $5,201 273 $33,700 2,574 $1,730 49,400 $80,000 - $11,317
251,504
kWh
$5,201
273
kW-months/year
$33,700
2,574
MMBtu
$1,730
49,400
lb
$80,000
-
$
TOTAL IMPLEMENTED Savings:
$9,948
Cost:
$11,392
$4,747 105,504 $5,201 273 - - - - - - $4,747
105,504
kWh
$5,201
273
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Other Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Other Gas Solid Waste (non-haz) Primary Product