Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2005 |
Principal Product | Flat Roll Steel Coil, Sheet |
NAICS | 331221 - Rolled Steel Shape Manufacturing |
SIC | 3444 - Sheet Metalwork |
Sales | $100,000,000-$500,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 300,000 |
Annual Production | 453,864,011 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $188,546 | 2,992,960 | kWh | $0.06 |
Electricity Demand | $84,128 | 7,092 | kW-months/year | $11.86 |
Natural Gas | $55,719 | 6,656 | MMBtu | $8.37 |
TOTAL ENERGY COSTS | $335,206 | |||
RECOMMENDED SAVINGS* | $131,948 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,948 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Gas | Solid Waste (non-haz) | Primary Product | Electricity Usage | Electricity Demand | Other Gas | Solid Waste (non-haz) | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $113,700 Cost: $454,800 |
- | - | - | - | $33,700 | 2,574 | - | - | $80,000 | - |
- - kWh |
- - kW-months/year |
$33,700 2,574 MMBtu |
- - lb |
$80,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $6,570 Cost: $21,200 |
$6,570 | 146,000 | - | - | - | - | - | - | - | - |
$6,570 146,000 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,334 Cost: $192 |
$2,349 | 52,200 | $1,985 | 104 | - | - | - | - | - | - |
$2,349 52,200 kWh |
$1,985 104 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $2,776 Cost: $1,448 |
$1,088 | 24,184 | $1,688 | 89 | - | - | - | - | - | - |
$1,088 24,184 kWh |
$1,688 89 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,734 Cost: $9,650 |
$1,206 | 26,800 | $1,528 | 80 | - | - | - | - | - | - |
$1,206 26,800 kWh |
$1,528 80 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $1,730 Cost: - |
- | - | - | - | - | - | $1,730 | 49,400 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,730 49,400 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $104 Cost: $102 |
$104 | 2,320 | - | - | - | - | - | - | - | - |
$104 2,320 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $131,948 Cost: $487,392 |
$11,317 | 251,504 | $5,201 | 273 | $33,700 | 2,574 | $1,730 | 49,400 | $80,000 | - | $11,317 251,504 kWh |
$5,201 273 kW-months/year |
$33,700 2,574 MMBtu |
$1,730 49,400 lb |
$80,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,948 Cost: $11,392 |
$4,747 | 105,504 | $5,201 | 273 | - | - | - | - | - | - | $4,747 105,504 kWh |
$5,201 273 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Gas | Solid Waste (non-haz) | Primary Product | Electricity Usage | Electricity Demand | Other Gas | Solid Waste (non-haz) | Primary Product |