IAC logo
IAC Assessment: UD0738
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0738
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2006
Principal Product CNC Machining of Various Materials
NAICS 333514 - Special Die and Tool, Die Set, Jig, and Fixture Manufacturing
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 28,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 7,344
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,744 3,113,440 kWh $0.02
Electricity Demand $57,946 369 kW-months/year $157.04
Natural Gas $16,797 1,564 MMBtu $10.74
TOTAL ENERGY COSTS $139,487
RECOMMENDED SAVINGS* $143,176 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $110,444
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$91,800
Cost:
$6,000
- - - - - - - - $91,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$91,800
-
$
02: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$28,944
Cost:
$2,000
- - - - - - $28,944 2,525 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$28,944
2,525
gal
-
-
$
03: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$8,313
Cost:
-
- - - - $8,313 774 - - - - -
-
kWh
-
-
kW-months/year
$8,313
774
MMBtu
-
-
gal
-
-
$
04: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$7,084
Cost:
-
- - - - $7,084 660 - - - - -
-
kWh
-
-
kW-months/year
$7,084
660
MMBtu
-
-
gal
-
-
$
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,819
Cost:
-
$1,090 40,120 $729 5 - - - - - - $1,090
40,120
kWh
$729
5
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,479
Cost:
$1,700
- - $1,479 31,524 - - - - - - -
-
kWh
$1,479
31,524
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,348
Cost:
$500
$357 13,319 $859 5 $132 10 - - - - $357
13,319
kWh
$859
5
kW-months/year
$132
10
MMBtu
-
-
gal
-
-
$
08: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$859
Cost:
-
$859 31,824 - - - - - - - - $859
31,824
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
09: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$658
Cost:
$500
- - $658 13,539 - - - - - - -
-
kWh
$658
13,539
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$401
Cost:
-
$222 8,225 $179 1 - - - - - - $222
8,225
kWh
$179
1
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
11: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$382
Cost:
$459
$28 477 - - $354 33 - - - - $28
477
kWh
-
-
kW-months/year
$354
33
MMBtu
-
-
gal
-
-
$
12: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$89
Cost:
$400
- - - - $89 8 - - - - -
-
kWh
-
-
kW-months/year
$89
8
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$143,176
Cost:
$11,559
$2,556 93,965 $3,904 45,074 $15,972 1,485 $28,944 2,525 $91,800 - $2,556
93,965
kWh
$3,904
45,074
kW-months/year
$15,972
1,485
MMBtu
$28,944
2,525
gal
$91,800
-
$
TOTAL IMPLEMENTED Savings:
$110,444
Cost:
$7,459
$1,244 45,620 $1,517 13,544 $15,883 1,477 - - $91,800 - $1,244
45,620
kWh
$1,517
13,544
kW-months/year
$15,883
1,477
MMBtu
-
-
gal
$91,800
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes