IAC Assessment: UD0782
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0782
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2008
Principal Product Ball and Roller Bearings
NAICS 332991 - Ball and Roller Bearing Manufacturing
SIC 3562 - Ball And Roller Bearings
Sales $100,000,000-$500,000,000
# of Employees 205
Plant Area (Sq.Ft.) 133,000
Annual Production 1,640,000 Pieces
Production Hrs. Annual 6,600
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $250,398 6,606,600 kWh $0.04
Electricity Demand $88,814 1,102 kW-months/year $80.59
Natural Gas $111,820 10,650 MMBtu $10.50
TOTAL ENERGY COSTS $451,032
RECOMMENDED SAVINGS* $56,330 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,327
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$28,951
Cost:
-
$28,951 689,304 - - - - $28,951
689,304
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,748
Cost:
$6,528
$5,748 136,858 - - - - $5,748
136,858
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$5,068
Cost:
$20,000
- - - - $5,068 482 -
-
kWh
-
-
kW-months/year
$5,068
482
MMBtu
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,245
Cost:
-
$4,245 101,059 - - - - $4,245
101,059
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,643
Cost:
-
$1,793 42,680 $850 10 - - $1,793
42,680
kWh
$850
10
kW-months/year
-
-
MMBtu
06: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$3,233
Cost:
$10,000
$3,233 76,982 - - - - $3,233
76,982
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,243
Cost:
$1,800
$1,074 25,561 $1,169 14 - - $1,074
25,561
kWh
$1,169
14
kW-months/year
-
-
MMBtu
08: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$1,292
Cost:
$2,000
- - - - $1,292 123 -
-
kWh
-
-
kW-months/year
$1,292
123
MMBtu
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,907
Cost:
$1,000
$2,245 53,460 $662 8 - - $2,245
53,460
kWh
$662
8
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$56,330
Cost:
$41,328
$47,289 1,125,904 $2,681 32 $6,360 605 $47,289
1,125,904
kWh
$2,681
32
kW-months/year
$6,360
605
MMBtu
TOTAL IMPLEMENTED Savings:
$47,327
Cost:
$19,328
$45,496 1,083,224 $1,831 22 - - $45,496
1,083,224
kWh
$1,831
22
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas