IAC logo
IAC Assessment: UD0811
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0811
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2010
Principal Product Aluminum, stainless and carbon slit coils and sheets
NAICS 331221 - Rolled Steel Shape Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales $50,000,000-$100,000,000
# of Employees 50
Plant Area (Sq.Ft.) 180,000
Annual Production 70,000 Tons
Production Hrs. Annual 3,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,194 1,358,776 kWh $0.06
Electricity Demand $89,961 491 kW-months/year $183.22
Natural Gas $44,936 3,856 MMBtu $11.65
TOTAL ENERGY COSTS $214,091
RECOMMENDED SAVINGS* $48,361 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$27,175
Cost:
-
- - - - $27,175 - - - -
-
kWh
-
-
kW-months/year
$27,175
-
$
-
-
MMBtu
02: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$7,064
Cost:
$13,132
- - - - - - $7,064 1,177 -
-
kWh
-
-
kW-months/year
-
-
$
$7,064
1,177
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$897
Cost:
$1,000
$640 10,666 $257 1 - - - - $640
10,666
kWh
$257
1
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$646
Cost:
-
$461 7,684 $185 1 - - - - $461
7,684
kWh
$185
1
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,579
Cost:
$50,000
$4,680 78,000 $7,899 39 - - - - $4,680
78,000
kWh
$7,899
39
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$48,361
Cost:
$64,132
$5,781 96,350 $8,341 41 $27,175 - $7,064 1,177 $5,781
96,350
kWh
$8,341
41
kW-months/year
$27,175
-
$
$7,064
1,177
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas