IAC Assessment: UD0835
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0835
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2011
Principal Product Shock Absorbers
NAICS 336330 - Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 160
Plant Area (Sq.Ft.) 112,000
Annual Production 1,500,000 Pieces
Production Hrs. Annual 5,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $218,240 3,203,440 kWh $0.07
Electricity Demand $108,780 943 kW-months/year $115.36
Natural Gas $95,376 9,578 MMBtu $9.96
TOTAL ENERGY COSTS $432,851
RECOMMENDED SAVINGS* $83,967 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $305
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$21,722
Cost:
$145,390
$21,722 54,702 - - - - - - $21,722
54,702
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$305
Cost:
$25
$199 2,922 $106 1 - - - - $199
2,922
kWh
$106
1
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,411
Cost:
$200
$3,894 57,266 $817 7 - - $(-300) - $3,894
57,266
kWh
$817
7
kW-months/year
-
-
MMBtu
$(-300)
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,430
Cost:
$11,500
- - - - $2,430 244 - - -
-
kWh
-
-
kW-months/year
$2,430
244
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,571
Cost:
$40,131
$6,890 101,331 $3,681 31 - - - - $6,890
101,331
kWh
$3,681
31
kW-months/year
-
-
MMBtu
-
-
$
06: 2.1224 REPLACE BOILER Savings:
$15,607
Cost:
$52,190
- - - - $15,607 1,567 - - -
-
kWh
-
-
kW-months/year
$15,607
1,567
MMBtu
-
-
$
07: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$15,451
Cost:
$12,000
$15,476 227,590 - - - - $(-25) - $15,476
227,590
kWh
-
-
kW-months/year
-
-
MMBtu
$(-25)
-
$
08: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$13,470
Cost:
$14,800
- - - - $13,470 1,352 - - -
-
kWh
-
-
kW-months/year
$13,470
1,352
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$83,967
Cost:
$276,236
$48,181 443,811 $4,604 39 $31,507 3,163 $(-325) - $48,181
443,811
kWh
$4,604
39
kW-months/year
$31,507
3,163
MMBtu
$(-325)
-
$
TOTAL IMPLEMENTED Savings:
$305
Cost:
$25
$199 2,922 $106 1 - - - - $199
2,922
kWh
$106
1
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes