IAC logo
IAC Assessment: UD0844
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0844
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2011
Principal Product Hydraulic hose, fittings,couplings
NAICS 326122 - Plastics Pipe and Pipe Fitting Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 493,000
Annual Production 5,799 Tons
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $906,293 24,696,850 kWh $0.04
Electricity Demand $676,915 43,584 kW-months/year $15.53
Natural Gas $554,732 100,050 MMBtu $5.54
TOTAL ENERGY COSTS $2,574,803
RECOMMENDED SAVINGS* $385,454 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,709
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ Tgal
01: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$170,257
Cost:
$280,000
$(-1,212) (-31,223) $(-2,346) (-150) - - - - $128,623 17,949,008 - - $45,192 - $(-1,212)
(-31,223)
kWh
$(-2,346)
(-150)
kW-months/year
-
-
$
-
-
MMBtu
$128,623
17,949,008
Tgal
-
-
$
$45,192
-
Tgal
02: 3.1221 USE REACTIVE RINSING Savings:
$70,989
Cost:
$30,000
- - - - - - - - $52,532 7,500,196 - - $18,457 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$52,532
7,500,196
Tgal
-
-
$
$18,457
-
Tgal
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,543
Cost:
$16,000
- - - - $11,543 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$11,543
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$33,247
Cost:
$2,000
$33,247 870,333 - - - - - - - - - - - - $33,247
870,333
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,557
Cost:
-
$1,441 37,129 $1,116 72 - - - - - - - - - - $1,441
37,129
kWh
$1,116
72
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$20,051
Cost:
$18,555
$12,751 326,943 $7,300 468 - - - - - - - - - - $12,751
326,943
kWh
$7,300
468
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,542
Cost:
-
$4,796 122,982 $2,746 168 - - - - - - - - - - $4,796
122,982
kWh
$2,746
168
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,988
Cost:
$5,000
$2,532 65,226 $1,456 96 - - - - - - - - - - $2,532
65,226
kWh
$1,456
96
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,616
Cost:
$500
$1,216 31,332 $700 44 - - - - - - $(-300) - - - $1,216
31,332
kWh
$700
44
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$(-300)
-
$
-
-
Tgal
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$267
Cost:
-
$148 3,814 $119 8 - - - - - - - - - - $148
3,814
kWh
$119
8
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
11: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$13,123
Cost:
$1,000
- - - - - - $13,123 2,360 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$13,123
2,360
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
12: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$10,508
Cost:
$16,000
- - - - - - $10,508 1,890 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$10,508
1,890
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
13: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$3,225
Cost:
-
- - - - - - $3,225 580 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,225
580
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
14: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$18,762
Cost:
-
- - - - - - $18,762 3,374 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$18,762
3,374
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
15: 2.7314 REDUCE VENTILATION AIR Savings:
$17,779
Cost:
-
$1,251 32,227 - - - - $16,528 2,973 - - - - - - $1,251
32,227
kWh
-
-
kW-months/year
-
-
$
$16,528
2,973
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$385,454
Cost:
$369,055
$56,170 1,458,763 $11,091 706 $11,543 - $62,146 11,177 $181,155 25,449,204 $(-300) - $63,649 - $56,170
1,458,763
kWh
$11,091
706
kW-months/year
$11,543
-
$
$62,146
11,177
MMBtu
$181,155
25,449,204
Tgal
$(-300)
-
$
$63,649
-
Tgal
TOTAL IMPLEMENTED Savings:
$34,709
Cost:
$1,000
$1,589 40,943 $1,235 80 - - $31,885 5,734 - - - - - - $1,589
40,943
kWh
$1,235
80
kW-months/year
-
-
$
$31,885
5,734
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Water Consumption