IAC logo
IAC Assessment: UD0860
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0860
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2012
Principal Product Reprocessed Metal Components
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 40,000
Annual Production 300,000 Pieces
Production Hrs. Annual 2,450
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,240 443,800 kWh $0.07
Electricity Demand $24,424 2,916 kW-months/year $8.38
Natural Gas $38,886 5,740 MMBtu $6.77
TOTAL ENERGY COSTS $95,550
RECOMMENDED SAVINGS* $13,484 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,649
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$270
Cost:
$500
$261 3,823 - - - - $9 - $261
3,823
kWh
-
-
kW-months/year
-
-
MMBtu
$9
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$519
Cost:
-
$260 3,793 $259 30 - - - - $260
3,793
kWh
$259
30
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$267
Cost:
$1,000
$166 2,419 $101 12 - - - - $166
2,419
kWh
$101
12
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$11,863
Cost:
$5,250
- - - - $11,863 1,752 - - -
-
kWh
-
-
kW-months/year
$11,863
1,752
MMBtu
-
-
$
05: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$565
Cost:
$900
- - - - $565 83 - - -
-
kWh
-
-
kW-months/year
$565
83
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,484
Cost:
$7,650
$687 10,035 $360 42 $12,428 1,835 $9 - $687
10,035
kWh
$360
42
kW-months/year
$12,428
1,835
MMBtu
$9
-
$
TOTAL IMPLEMENTED Savings:
$12,649
Cost:
$6,250
$426 6,212 $360 42 $11,863 1,752 - - $426
6,212
kWh
$360
42
kW-months/year
$11,863
1,752
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes