Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2013 |
Principal Product | Insulated vinyl windows and patio doors |
NAICS | 326121 - Unlaminated Plastics Profile Shape Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 309 |
Plant Area (Sq.Ft.) | 279,600 |
Annual Production | 455,177 Units |
Production Hrs. Annual | 7,488 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $294,118 | 5,242,800 | kWh | $0.06 |
Electricity Demand | $208,852 | 12,381 | kW-months/year | $16.87 |
Electricity Fees | $1,146 | - | $ | - |
Natural Gas | $36,508 | 3,693 | MMBtu | $9.89 |
TOTAL ENERGY COSTS | $540,624 | |||
RECOMMENDED SAVINGS* | $42,618 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,013 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,925 Cost: $4,300 |
$8,006 | 143,087 | $1,919 | 227 | - | - | - | - |
$8,006 143,087 kWh |
$1,919 227 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,208 Cost: $1,000 |
$4,257 | 61,700 | $551 | 112 | - | - | $(-600) | - |
$4,257 61,700 kWh |
$551 112 kW-months/year |
- - MMBtu |
$(-600) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,013 Cost: - |
$2,704 | 48,320 | $1,309 | 78 | - | - | - | - |
$2,704 48,320 kWh |
$1,309 78 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2311 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS |
Savings: $10,323 Cost: - |
$6,955 | 124,301 | $3,368 | 199 | - | - | - | - |
$6,955 124,301 kWh |
$3,368 199 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $9,804 Cost: $5,000 |
$13,364 | 238,857 | $6,324 | 374 | $(-9,884) | (-1,019) | - | - |
$13,364 238,857 kWh |
$6,324 374 kW-months/year |
$(-9,884) (-1,019) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,345 Cost: $1,205 |
$3,127 | 52,560 | $1,218 | 72 | - | - | - | - |
$3,127 52,560 kWh |
$1,218 72 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $42,618 Cost: $11,505 |
$38,413 | 668,825 | $14,689 | 1,062 | $(-9,884) | (-1,019) | $(-600) | - | $38,413 668,825 kWh |
$14,689 1,062 kW-months/year |
$(-9,884) (-1,019) MMBtu |
$(-600) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,013 Cost: - |
$2,704 | 48,320 | $1,309 | 78 | - | - | - | - | $2,704 48,320 kWh |
$1,309 78 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |