Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2014
Principal Product Bakery Equipment
NAICS 333241 - Food Product Machinery Manufacturing
SIC 3556 - Food Products Machinery
Sales $10,000,000-$50,000,000
# of Employees 104
Plant Area (Sq.Ft.) 150,000
Annual Production 150 Units
Production Hrs. Annual 2,860
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,043 1,018,705 kWh $0.06
Electricity Demand $17,139 3,636 kW-months/year $4.71
Electricity Fees $192 - $ -
Natural Gas $52,741 5,765 MMBtu $9.15
TOTAL ENERGY COSTS $128,115
RECOMMENDED SAVINGS* $45,284 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,461
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7314 REDUCE VENTILATION AIR Savings:
$27,790
Cost:
$9,213
- - - - $27,790 3,037 - - -
-
kWh
-
-
kW-months/year
$27,790
3,037
MMBtu
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$14,091
Cost:
$200
- - - - $14,091 1,540 - - -
-
kWh
-
-
kW-months/year
$14,091
1,540
MMBtu
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$540
Cost:
$1,500
- - - - $540 59 - - -
-
kWh
-
-
kW-months/year
$540
59
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$698
Cost:
$170
$579 10,270 $101 21 - - $18 - $579
10,270
kWh
$101
21
kW-months/year
-
-
MMBtu
$18
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$583
Cost:
$210
$479 8,498 $84 18 - - $20 - $479
8,498
kWh
$84
18
kW-months/year
-
-
MMBtu
$20
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$119
Cost:
$20
$119 2,105 - - - - - - $119
2,105
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$566
Cost:
-
$419 7,436 $147 31 - - - - $419
7,436
kWh
$147
31
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$565
Cost:
$2,500
$(-31) (-556) $(-11) (-2) $607 66 - - $(-31)
(-556)
kWh
$(-11)
(-2)
kW-months/year
$607
66
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$332
Cost:
-
$246 4,358 $86 18 - - - - $246
4,358
kWh
$86
18
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$45,284
Cost:
$13,813
$1,811 32,111 $407 86 $43,028 4,702 $38 - $1,811
32,111
kWh
$407
86
kW-months/year
$43,028
4,702
MMBtu
$38
-
$
TOTAL IMPLEMENTED Savings:
$29,461
Cost:
$13,213
$388 6,880 $136 29 $28,937 3,162 - - $388
6,880
kWh
$136
29
kW-months/year
$28,937
3,162
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes