IAC Assessment: UD0904
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0904
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2014
Principal Product Catalytic Convertors, Torque Convertors, Silencers
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 1,000
Plant Area (Sq.Ft.) 417,000
Annual Production 8,880,619 Pieces
Production Hrs. Annual 6,600
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,508,825 40,397,514 kWh $0.04
Electricity Demand $717,182 75,732 kW-months/year $9.47
Natural Gas $206,656 38,120 MMBtu $5.42
TOTAL ENERGY COSTS $2,660,586
RECOMMENDED SAVINGS* $396,971 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $147,219
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,181
Cost:
-
$6,766 183,174 $3,415 361 - - - - - - - - $6,766
183,174
kWh
$3,415
361
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$6,875
Cost:
-
- - - - $6,875 1,268 - - - - - - -
-
kWh
-
-
kW-months/year
$6,875
1,268
MMBtu
-
-
gal
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,359
Cost:
$450
$2,486 67,297 $873 92 - - - - - - - - $2,486
67,297
kWh
$873
92
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$34,024
Cost:
$5,000
$24,768 670,496 $9,256 978 - - - - - - - - $24,768
670,496
kWh
$9,256
978
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$33,689
Cost:
$62,131
$(-759) (-20,559) $(-294) (-31) $34,742 6,410 - - - - - - $(-759)
(-20,559)
kWh
$(-294)
(-31)
kW-months/year
$34,742
6,410
MMBtu
-
-
gal
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,892
Cost:
-
$5,017 135,828 $1,875 198 - - - - - - - - $5,017
135,828
kWh
$1,875
198
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$777
Cost:
$384
$510 13,817 $267 28 - - - - - - - - $510
13,817
kWh
$267
28
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$66,236
Cost:
$75,700
$44,887 1,215,120 $21,349 2,255 - - - - - - - - $44,887
1,215,120
kWh
$21,349
2,255
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,039
Cost:
-
$1,509 40,844 $530 56 - - - - - - - - $1,509
40,844
kWh
$530
56
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
10: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$16,866
Cost:
$20,982
$11,394 308,448 $5,961 629 $(-489) (-90) - - - - - - $11,394
308,448
kWh
$5,961
629
kW-months/year
$(-489)
(-90)
MMBtu
-
-
gal
-
-
$
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,786
Cost:
$10,400
$2,786 75,415 - - - - - - - - - - $2,786
75,415
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
12: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$96,196
Cost:
$72,000
$(-1,643) (-44,468) $(-3,125) (-336) - - $99,494 353,578 $1,470 - - - $(-1,643)
(-44,468)
kWh
$(-3,125)
(-336)
kW-months/year
-
-
MMBtu
$99,494
353,578
gal
$1,470
-
$
-
-
$
13: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$69,423
Cost:
$62,000
$(-2,947) (-79,772) $(-4,205) (-444) - - $76,575 352,800 - - - - $(-2,947)
(-79,772)
kWh
$(-4,205)
(-444)
kW-months/year
-
-
MMBtu
$76,575
352,800
gal
-
-
$
-
-
$
14: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$47,628
Cost:
$1,300
- - - - - - - - - - $47,628 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$47,628
-
$
TOTAL RECOMMENDED Savings:
$396,971
Cost:
$310,347
$94,774 2,565,640 $35,902 3,787 $41,128 7,588 $176,069 706,378 $1,470 - $47,628 - $94,774
2,565,640
kWh
$35,902
3,787
kW-months/year
$41,128
7,588
MMBtu
$176,069
706,378
gal
$1,470
-
$
$47,628
-
$
TOTAL IMPLEMENTED Savings:
$147,219
Cost:
$112,532
$98,104 2,655,778 $42,729 4,514 $6,386 1,178 - - - - - - $98,104
2,655,778
kWh
$42,729
4,514
kW-months/year
$6,386
1,178
MMBtu
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost