IAC Assessment: UD0927
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0927
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2015
Principal Product Steel Fabrication
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 214
Plant Area (Sq.Ft.) 600,000
Annual Production 144,053 Units
Production Hrs. Annual 5,005
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $375,762 5,825,766 kWh $0.06
Electricity Demand $173,728 19,848 kW-months/year $8.75
Natural Gas $147,395 31,747 MMBtu $4.64
TOTAL ENERGY COSTS $696,885
RECOMMENDED SAVINGS* $107,735 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,047
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,206
Cost:
$1,000
$9,246 134,389 $1,760 184 - - - - $(-4,800) - - - $9,246
134,389
kWh
$1,760
184
kW-months/year
-
-
$
-
-
MMBtu
$(-4,800)
-
$
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,025
Cost:
-
$5,025 73,021 - - - - - - - - - - $5,025
73,021
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,022
Cost:
$300
$4,219 61,320 $803 84 - - - - - - - - $4,219
61,320
kWh
$803
84
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$11,905
Cost:
-
- - - - - - $12,070 2,536 $(-165) - - - -
-
kWh
-
-
kW-months/year
-
-
$
$12,070
2,536
MMBtu
$(-165)
-
$
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,750
Cost:
$3,000
- - - - - - $4,750 998 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,750
998
MMBtu
-
-
$
-
-
$
06: 2.8112 COMBINE UTILITY METERS Savings:
$63,547
Cost:
$50,000
- - - - $63,547 - - - - - - - -
-
kWh
-
-
kW-months/year
$63,547
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$11,280
Cost:
-
- - - - - - - - - - $11,280 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$11,280
-
$
TOTAL RECOMMENDED Savings:
$107,735
Cost:
$54,300
$18,490 268,730 $2,563 268 $63,547 - $16,820 3,534 $(-4,965) - $11,280 - $18,490
268,730
kWh
$2,563
268
kW-months/year
$63,547
-
$
$16,820
3,534
MMBtu
$(-4,965)
-
$
$11,280
-
$
TOTAL IMPLEMENTED Savings:
$10,047
Cost:
$300
$9,244 134,341 $803 84 - - - - - - - - $9,244
134,341
kWh
$803
84
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost