Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2016 |
Principal Product | Temperature Control Equipment |
NAICS | 334519 - Other Measuring and Controlling Device Manufacturing |
SIC | 3585 - Refrigeration And Heating Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 94 |
Plant Area (Sq.Ft.) | 75,000 |
Annual Production | 2,000 Units |
Production Hrs. Annual | 2,990 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $71,458 | 744,800 | kWh | $0.10 |
Electricity Demand | $32,642 | 3,876 | kW-months/year | $8.42 |
Electricity Fees | $523 | - | $ | - |
Natural Gas | $32,316 | 4,868 | MMBtu | $6.64 |
TOTAL ENERGY COSTS | $141,752 | |||
RECOMMENDED SAVINGS* | $27,915 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $1,296 Cost: $50 |
- | - | - | - | $1,296 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,296 - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $245 Cost: $35 |
$181 | 2,621 | $64 | 7 | - | - | - | - | - | - | - | - |
$181 2,621 kWh |
$64 7 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,012 Cost: $810 |
$1,248 | 18,049 | $640 | 72 | - | - | - | - | $124 | - | - | - |
$1,248 18,049 kWh |
$640 72 kW-months/year |
- - $ |
- - MMBtu |
$124 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $2,967 Cost: $4,500 |
$1,254 | 18,139 | $2,570 | 291 | - | - | $(-857) | (-129) | - | - | - | - |
$1,254 18,139 kWh |
$2,570 291 kW-months/year |
- - $ |
$(-857) (-129) MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $10,803 Cost: $9,350 |
- | - | - | - | - | - | $10,803 | 1,627 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$10,803 1,627 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7314 REDUCE VENTILATION AIR |
Savings: $7,691 Cost: $28,200 |
$(-1,960) | (-28,348) | $(-1,024) | (-116) | - | - | $10,675 | 1,608 | - | - | - | - |
$(-1,960) (-28,348) kWh |
$(-1,024) (-116) kW-months/year |
- - $ |
$10,675 1,608 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7314 REDUCE VENTILATION AIR |
Savings: $1,533 Cost: - |
$92 | 1,333 | $25 | 3 | - | - | $1,416 | 213 | - | - | - | - |
$92 1,333 kWh |
$25 3 kW-months/year |
- - $ |
$1,416 213 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $1,368 Cost: - |
- | - | - | - | - | - | - | - | - | - | $1,368 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
$1,368 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,915 Cost: $42,945 |
$815 | 11,794 | $2,275 | 257 | $1,296 | - | $22,037 | 3,319 | $124 | - | $1,368 | - | $815 11,794 kWh |
$2,275 257 kW-months/year |
$1,296 - $ |
$22,037 3,319 MMBtu |
$124 - $ |
$1,368 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost |