IAC Assessment: UD0942
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0942
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2016
Principal Product Temperature Control Equipment
NAICS 334519 - Other Measuring and Controlling Device Manufacturing
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 94
Plant Area (Sq.Ft.) 75,000
Annual Production 2,000 Units
Production Hrs. Annual 2,990
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,458 744,800 kWh $0.10
Electricity Demand $32,642 3,876 kW-months/year $8.42
Electricity Fees $523 - $ -
Natural Gas $32,316 4,868 MMBtu $6.64
TOTAL ENERGY COSTS $141,752
RECOMMENDED SAVINGS* $27,915 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,296
Cost:
$50
- - - - $1,296 - - - - - - - -
-
kWh
-
-
kW-months/year
$1,296
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$245
Cost:
$35
$181 2,621 $64 7 - - - - - - - - $181
2,621
kWh
$64
7
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,012
Cost:
$810
$1,248 18,049 $640 72 - - - - $124 - - - $1,248
18,049
kWh
$640
72
kW-months/year
-
-
$
-
-
MMBtu
$124
-
$
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,967
Cost:
$4,500
$1,254 18,139 $2,570 291 - - $(-857) (-129) - - - - $1,254
18,139
kWh
$2,570
291
kW-months/year
-
-
$
$(-857)
(-129)
MMBtu
-
-
$
-
-
$
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$10,803
Cost:
$9,350
- - - - - - $10,803 1,627 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$10,803
1,627
MMBtu
-
-
$
-
-
$
06: 2.7314 REDUCE VENTILATION AIR Savings:
$7,691
Cost:
$28,200
$(-1,960) (-28,348) $(-1,024) (-116) - - $10,675 1,608 - - - - $(-1,960)
(-28,348)
kWh
$(-1,024)
(-116)
kW-months/year
-
-
$
$10,675
1,608
MMBtu
-
-
$
-
-
$
07: 2.7314 REDUCE VENTILATION AIR Savings:
$1,533
Cost:
-
$92 1,333 $25 3 - - $1,416 213 - - - - $92
1,333
kWh
$25
3
kW-months/year
-
-
$
$1,416
213
MMBtu
-
-
$
-
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,368
Cost:
-
- - - - - - - - - - $1,368 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$1,368
-
$
TOTAL RECOMMENDED Savings:
$27,915
Cost:
$42,945
$815 11,794 $2,275 257 $1,296 - $22,037 3,319 $124 - $1,368 - $815
11,794
kWh
$2,275
257
kW-months/year
$1,296
-
$
$22,037
3,319
MMBtu
$124
-
$
$1,368
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost