IAC logo
IAC Assessment: UD0951
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0951
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2016
Principal Product Metrology Machines
NAICS 334519 - Other Measuring and Controlling Device Manufacturing
SIC 3829 - Measuring & Controlling Devices, Nec
Sales $10,000,000-$50,000,000
# of Employees 62
Plant Area (Sq.Ft.) 45,000
Annual Production 136,309 Units
Production Hrs. Annual 2,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,167 1,115,440 kWh $0.08
Electricity Demand $17,444 2,700 kW-months/year $6.46
Natural Gas $8,114 1,229 MMBtu $6.60
TOTAL ENERGY COSTS $110,725
RECOMMENDED SAVINGS* $18,166 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,332
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,773
Cost:
-
$4,322 56,789 - - $451 - - - $4,322
56,789
kWh
-
-
kW-months/year
$451
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,278
Cost:
$1,200
$2,753 36,173 - - $525 - - - $2,753
36,173
kWh
-
-
kW-months/year
$525
-
$
-
-
$
03: 3.2124 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS Savings:
$5,257
Cost:
$700
$44 575 $113 17 - - $5,100 - $44
575
kWh
$113
17
kW-months/year
-
-
$
$5,100
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$780
Cost:
$750
$780 10,255 - - - - - - $780
10,255
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$746
Cost:
$50
$667 8,760 $79 12 - - - - $667
8,760
kWh
$79
12
kW-months/year
-
-
$
-
-
$
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$3,332
Cost:
$3,750
$3,332 43,776 - - - - - - $3,332
43,776
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$18,166
Cost:
$6,450
$11,898 156,328 $192 29 $976 - $5,100 - $11,898
156,328
kWh
$192
29
kW-months/year
$976
-
$
$5,100
-
$
TOTAL IMPLEMENTED Savings:
$3,332
Cost:
$3,750
$3,332 43,776 - - - - - - $3,332
43,776
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost