Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2016 |
Principal Product | Garage Door Hardware |
NAICS | 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
SIC | 3469 - Metal Stampings, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 90,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $180,081 | 2,010,777 | kWh | $0.09 |
Electricity Demand | $21,341 | 5,772 | kW-months/year | $3.70 |
Electricity Fees | $1,830 | - | $ | - |
Natural Gas | $34,191 | 4,436 | MMBtu | $7.71 |
TOTAL ENERGY COSTS | $238,334 | |||
RECOMMENDED SAVINGS* | $14,212 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,531 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | Electricity Usage | Electricity Demand | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,653 Cost: $42 |
$1,524 | 17,400 | $129 | 35 | - | - |
$1,524 17,400 kWh |
$129 35 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,397 Cost: $1,000 |
$1,753 | 20,023 | $148 | 40 | $(-504) | - |
$1,753 20,023 kWh |
$148 40 kW-months/year |
$(-504) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $1,140 Cost: $378 |
$1,051 | 12,000 | $89 | 24 | - | - |
$1,051 12,000 kWh |
$89 24 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $297 Cost: $468 |
$297 | 3,391 | - | - | - | - |
$297 3,391 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $5,273 Cost: - |
$4,680 | 53,453 | $593 | 160 | - | - |
$4,680 53,453 kWh |
$593 160 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,258 Cost: $3,250 |
$1,138 | 13,000 | $120 | 33 | - | - |
$1,138 13,000 kWh |
$120 33 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,097 Cost: $6,944 |
$2,871 | 32,789 | - | - | $226 | - |
$2,871 32,789 kWh |
- - kW-months/year |
$226 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $97 Cost: $336 |
$84 | 955 | $13 | 4 | - | - |
$84 955 kWh |
$13 4 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,212 Cost: $12,418 |
$13,398 | 153,011 | $1,092 | 295 | $(-278) | - | $13,398 153,011 kWh |
$1,092 295 kW-months/year |
$(-278) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,531 Cost: $3,250 |
$5,818 | 66,453 | $713 | 193 | - | - | $5,818 66,453 kWh |
$713 193 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | Electricity Usage | Electricity Demand | Administrative Changes |