IAC Assessment: UD0961
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0961
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2017
Principal Product Injection Molded Plastic Goods
NAICS 326112 - Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 182,000
Annual Production 16,725,000 Pounds
Production Hrs. Annual 8,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $701,910 10,516,200 kWh $0.07
Electricity Demand $104,883 22,008 kW-months/year $4.77
Natural Gas $46,940 9,677 MMBtu $4.85
TOTAL ENERGY COSTS $853,733
RECOMMENDED SAVINGS* $65,586 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$23,931
Cost:
$14,250
$4,539 74,270 $540 112 $18,852 3,887 - - $4,539
74,270
kWh
$540
112
kW-months/year
$18,852
3,887
MMBtu
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,308
Cost:
-
$4,308 70,497 - - - - - - $4,308
70,497
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,272
Cost:
$4,748
$1,143 18,706 $129 27 - - - - $1,143
18,706
kWh
$129
27
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,969
Cost:
$23,750
$4,466 73,080 $503 104 - - - - $4,466
73,080
kWh
$503
104
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,937
Cost:
$1,000
$3,610 59,081 $407 84 - - $(-1,080) - $3,610
59,081
kWh
$407
84
kW-months/year
-
-
MMBtu
$(-1,080)
-
$
06: 2.5123 REDUCE FLUID FLOW RATES Savings:
$5,273
Cost:
$1,000
$4,739 77,556 $534 111 - - - - $4,739
77,556
kWh
$534
111
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,802
Cost:
$3,700
$4,264 69,781 $538 112 - - - - $4,264
69,781
kWh
$538
112
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$18,094
Cost:
$103,500
$16,262 266,112 $1,832 380 - - - - $16,262
266,112
kWh
$1,832
380
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$65,586
Cost:
$151,948
$43,331 709,083 $4,483 930 $18,852 3,887 $(-1,080) - $43,331
709,083
kWh
$4,483
930
kW-months/year
$18,852
3,887
MMBtu
$(-1,080)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes