IAC Assessment: UD0992
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0992
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2018
Principal Product Grey Iron and Ductile Iron Castings
NAICS 331511 - Iron Foundries
SIC 3321 - Gray And Ductile Iron Foundries
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 108,000
Annual Production 10,000 Tons
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,800,451 21,224,360 kWh $0.08
Electricity Demand $72,851 6,248 kW-months/year $11.66
Electricity Fees $1,380 - $ -
Natural Gas $111,339 28,116 MMBtu $3.96
TOTAL ENERGY COSTS $2,014,489
RECOMMENDED SAVINGS* $107,729 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,245
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$14,245
Cost:
$700
- - - - $14,245 1,927 -
-
kWh
-
-
kW-months/year
$14,245
1,927
Tgal
02: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$48,158
Cost:
$1,000
$30,195 513,529 $17,963 1,541 - - $30,195
513,529
kWh
$17,963
1,541
kW-months/year
-
-
Tgal
03: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$30,337
Cost:
$32,600
$21,722 369,418 $8,615 739 - - $21,722
369,418
kWh
$8,615
739
kW-months/year
-
-
Tgal
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$11,815
Cost:
-
$9,291 158,017 $2,524 216 - - $9,291
158,017
kWh
$2,524
216
kW-months/year
-
-
Tgal
05: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,174
Cost:
$9,900
$2,489 42,924 $685 59 - - $2,489
42,924
kWh
$685
59
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$107,729
Cost:
$44,200
$63,697 1,083,888 $29,787 2,554 $14,245 1,927 $63,697
1,083,888
kWh
$29,787
2,554
kW-months/year
$14,245
1,927
Tgal
TOTAL IMPLEMENTED Savings:
$14,245
Cost:
$700
- - - - $14,245 1,927 -
-
kWh
-
-
kW-months/year
$14,245
1,927
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal