IAC logo
IAC Assessment: UD1003
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1003
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2019
Principal Product Automotive Fasteners
NAICS 332722 - Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $50,000,000-$100,000,000
# of Employees 90
Plant Area (Sq.Ft.) 200,000
Annual Production 250,000,000 Units
Production Hrs. Annual 4,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $256,328 3,110,400 kWh $0.08
Electricity Demand $24,771 10,985 kW-months/year $2.25
Electricity Fees $3,466 - $ -
Natural Gas $7,126 842 MMBtu $8.46
TOTAL ENERGY COSTS $291,691
RECOMMENDED SAVINGS* $33,627 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,512
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,324
Cost:
-
$3,072 37,273 $252 112 - - $3,072
37,273
kWh
$252
112
kW-months/year
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$17,300
Cost:
$4,100
$15,988 194,000 $1,312 582 - - $15,988
194,000
kWh
$1,312
582
kW-months/year
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,920
Cost:
-
$4,547 55,170 $373 166 - - $4,547
55,170
kWh
$373
166
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,211
Cost:
-
$3,892 47,223 $319 142 - - $3,892
47,223
kWh
$319
142
kW-months/year
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,159
Cost:
$728
$1,371 16,640 $112 50 $676 - $1,371
16,640
kWh
$112
50
kW-months/year
$676
-
$
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,712
Cost:
$3,540
$1,582 19,200 $130 58 - - $1,582
19,200
kWh
$130
58
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$33,627
Cost:
$8,368
$30,452 369,506 $2,499 1,108 $676 - $30,452
369,506
kWh
$2,499
1,108
kW-months/year
$676
-
$
TOTAL IMPLEMENTED Savings:
$21,512
Cost:
$4,100
$19,880 241,223 $1,632 724 - - $19,880
241,223
kWh
$1,632
724
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes