IAC logo
IAC Assessment: UD1020
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1020
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2020
Principal Product Batteries for automotive, industrial, farm use, etc.
NAICS 335911 - Storage Battery Manufacturing
SIC 3691 - Storage Batteries
Sales $100,000,000-$500,000,000
# of Employees 475
Plant Area (Sq.Ft.) 250,000
Annual Production 63,632,215 Pounds
Production Hrs. Annual 7,200
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,087,159 44,436,000 kWh $0.05
Electricity Demand $282,435 88,816 kW-months/year $3.18
Electricity Fees $407,784 - $ -
Natural Gas $233,831 47,465 MMBtu $4.93
TOTAL ENERGY COSTS $3,061,101
RECOMMENDED SAVINGS* $91,970 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$11,633
Cost:
$8,000
$10,449 222,456 $1,184 372 - - $10,449
222,456
kWh
$1,184
372
kW-months/year
-
-
MMBtu
02: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$52,332
Cost:
$47,243
- - - - $52,332 10,615 -
-
kWh
-
-
kW-months/year
$52,332
10,615
MMBtu
03: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$13,712
Cost:
$26,275
$12,917 275,000 $795 250 - - $12,917
275,000
kWh
$795
250
kW-months/year
-
-
MMBtu
04: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$5,584
Cost:
$27,600
$4,730 100,710 $854 269 - - $4,730
100,710
kWh
$854
269
kW-months/year
-
-
MMBtu
05: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$1,639
Cost:
$6,550
$1,500 31,933 $139 44 - - $1,500
31,933
kWh
$139
44
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,337
Cost:
$22,400
$4,879 103,868 $458 144 - - $4,879
103,868
kWh
$458
144
kW-months/year
-
-
MMBtu
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$901
Cost:
-
$673 14,323 $228 72 - - $673
14,323
kWh
$228
72
kW-months/year
-
-
MMBtu
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$832
Cost:
-
$679 14,461 $153 48 - - $679
14,461
kWh
$153
48
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$91,970
Cost:
$138,068
$35,827 762,751 $3,811 1,199 $52,332 10,615 $35,827
762,751
kWh
$3,811
1,199
kW-months/year
$52,332
10,615
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas