Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2022 |
Principal Product | Brakes |
NAICS | 336340 - Motor Vehicle Brake System Manufacturing |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $50,000,000-$100,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 800,568 |
Annual Production | 42,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,615,781 | 25,779,000 | kWh | $0.06 |
Electricity Demand | $218,446 | 58,097 | kW-months/year | $3.76 |
Electricity Fees | $1,146 | - | $ | - |
Natural Gas | $308,706 | 77,905 | MMBtu | $3.96 |
TOTAL ENERGY COSTS | $2,193,482 | |||
RECOMMENDED SAVINGS* | $139,688 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,065 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $11,133 Cost: $5,000 |
$6,580 | 104,938 | $4,553 | 1,211 | - | - | - | - |
$6,580 104,938 kWh |
$4,553 1,211 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $8,382 Cost: - |
$8,382 | 133,680 | - | - | - | - | - | - |
$8,382 133,680 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,188 Cost: $676 |
$3,870 | 61,721 | $318 | 85 | - | - | - | - |
$3,870 61,721 kWh |
$318 85 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,863 Cost: $10,000 |
$1,858 | 29,633 | $223 | 59 | $1,782 | 450 | - | - |
$1,858 29,633 kWh |
$223 59 kW-months/year |
$1,782 450 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,586 Cost: - |
$2,390 | 38,124 | $196 | 52 | - | - | - | - |
$2,390 38,124 kWh |
$196 52 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $31,642 Cost: $15,000 |
$28,253 | 450,600 | $3,389 | 901 | - | - | - | - |
$28,253 450,600 kWh |
$3,389 901 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2514 COVER OPEN TANKS |
Savings: $7,338 Cost: $15,000 |
$6,259 | 99,511 | $1,079 | 287 | - | - | - | - |
$6,259 99,511 kWh |
$1,079 287 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $30,918 Cost: $30,918 |
- | - | - | - | $30,918 | 7,808 | - | - |
- - kWh |
- - kW-months/year |
$30,918 7,808 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS |
Savings: $6,625 Cost: $5,000 |
$5,343 | 85,225 | $1,282 | 341 | - | - | - | - |
$5,343 85,225 kWh |
$1,282 341 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $18,888 Cost: $23,132 |
$16,865 | 268,987 | $2,023 | 538 | - | - | - | - |
$16,865 268,987 kWh |
$2,023 538 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $909 Cost: - |
$812 | 12,944 | $97 | 26 | - | - | - | - |
$812 12,944 kWh |
$97 26 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $2,847 Cost: $1,000 |
- | - | - | - | - | - | $2,847 | 1,460 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,847 1,460 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,446 Cost: $4,227 |
- | - | $1,446 | 384 | - | - | - | - |
- - kWh |
$1,446 384 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,264 Cost: $7,500 |
$5,264 | 83,950 | - | - | - | - | - | - |
$5,264 83,950 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,659 Cost: $7,500 |
$3,381 | 53,931 | $278 | 74 | - | - | - | - |
$3,381 53,931 kWh |
$278 74 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $139,688 Cost: $124,953 |
$89,257 | 1,423,244 | $14,884 | 3,958 | $32,700 | 8,258 | $2,847 | 1,460 | $89,257 1,423,244 kWh |
$14,884 3,958 kW-months/year |
$32,700 8,258 MMBtu |
$2,847 1,460 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,065 Cost: $676 |
$15,454 | 246,469 | $611 | 163 | - | - | - | - | $15,454 246,469 kWh |
$611 163 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal |