Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2023 |
Principal Product | Automotive Shock Absorbers |
NAICS | 336340 - Motor Vehicle Brake System Manufacturing |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $100,000,000-$500,000,000 |
# of Employees | 420 |
Plant Area (Sq.Ft.) | 135,300 |
Annual Production | 7,595,120 Units |
Production Hrs. Annual | 6,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $960,587 | 17,299,200 | kWh | $0.06 |
Electricity Demand | $995,183 | 46,613 | kW-months/year | $21.35 |
Electricity Fees | $1,944 | - | $ | - |
Natural Gas | $213,604 | 38,453 | MMBtu | $5.55 |
TOTAL ENERGY COSTS | $2,265,177 | |||
RECOMMENDED SAVINGS* | $113,960 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $46,988 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $5,427 Cost: - |
$3,079 | 54,980 | $2,348 | 110 | - | - | - | - |
$3,079 54,980 kWh |
$2,348 110 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $18,718 Cost: $6,322 |
$12,296 | 219,575 | $6,422 | 301 | - | - | - | - |
$12,296 219,575 kWh |
$6,422 301 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $14,073 Cost: - |
$14,073 | 251,310 | - | - | - | - | - | - |
$14,073 251,310 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $27,488 Cost: $952 |
$18,057 | 322,449 | $9,431 | 442 | - | - | - | - |
$18,057 322,449 kWh |
$9,431 442 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $13,453 Cost: $9,000 |
$(-110) | (-1,964) | $(-119) | (-6) | $13,682 | 2,465 | - | - |
$(-110) (-1,964) kWh |
$(-119) (-6) kW-months/year |
$13,682 2,465 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $34,801 Cost: $16,950 |
- | - | - | - | - | - | $34,801 | 3,629 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$34,801 3,629 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $113,960 Cost: $33,224 |
$47,395 | 846,350 | $18,082 | 847 | $13,682 | 2,465 | $34,801 | 3,629 | $47,395 846,350 kWh |
$18,082 847 kW-months/year |
$13,682 2,465 MMBtu |
$34,801 3,629 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $46,988 Cost: $952 |
$35,209 | 628,739 | $11,779 | 552 | - | - | - | - | $35,209 628,739 kWh |
$11,779 552 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal |