IAC logo
IAC Assessment: UD1065
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1065
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2023
Principal Product Steel Pipe and Tubes
NAICS 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317 - Steel Pipe And Tubes
Sales $50,000,000-$100,000,000
# of Employees 160
Plant Area (Sq.Ft.) 425,000
Annual Production 54,013,022 Pounds
Production Hrs. Annual 6,240
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $383,160 7,255,710 kWh $0.05
Electricity Demand $475,730 31,401 kW-months/year $15.15
Electricity Fees $780 - $ -
Natural Gas $115,057 19,525 MMBtu $5.89
TOTAL ENERGY COSTS $993,001
RECOMMENDED SAVINGS* $83,235 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,026
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Disposal Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$589
Cost:
-
$272 5,159 $317 21 - - - - - - $272
5,159
kWh
$317
21
kW-months/year
-
-
Tgal
-
-
$
-
-
$
02: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$12,692
Cost:
$430
- - - - $12,692 1,419 - - - - -
-
kWh
-
-
kW-months/year
$12,692
1,419
Tgal
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$38,039
Cost:
-
$24,513 464,256 $13,526 893 - - - - - - $24,513
464,256
kWh
$13,526
893
kW-months/year
-
-
Tgal
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$19,345
Cost:
$19,667
$7,117 134,784 $11,781 778 - - $6 - $441 - $7,117
134,784
kWh
$11,781
778
kW-months/year
-
-
Tgal
$6
-
$
$441
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,046
Cost:
$952
$800 15,144 $1,246 82 - - - - - - $800
15,144
kWh
$1,246
82
kW-months/year
-
-
Tgal
-
-
$
-
-
$
06: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$210
Cost:
$741
$210 3,974 - - - - - - - - $210
3,974
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,980
Cost:
$2,457
$6,980 132,198 - - - - - - - - $6,980
132,198
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,334
Cost:
$3,051
$3,334 63,141 - - - - - - - - $3,334
63,141
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$83,235
Cost:
$27,298
$43,226 818,656 $26,870 1,774 $12,692 1,419 $6 - $441 - $43,226
818,656
kWh
$26,870
1,774
kW-months/year
$12,692
1,419
Tgal
$6
-
$
$441
-
$
TOTAL IMPLEMENTED Savings:
$9,026
Cost:
$3,409
$7,780 147,342 $1,246 82 - - - - - - $7,780
147,342
kWh
$1,246
82
kW-months/year
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Disposal Personnel Changes One-time Revenue or Avoided Cost