IAC Assessment: UD1066
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1066
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2023
Principal Product Aircraft Parts
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 110,000
Annual Production 3,782 Units
Production Hrs. Annual 4,250
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $224,826 3,827,497 kWh $0.06
Electricity Demand $42,294 8,470 kW-months/year $4.99
Electricity Fees $7,471 - $ -
Natural Gas $37,092 3,838 MMBtu $9.66
TOTAL ENERGY COSTS $311,683
RECOMMENDED SAVINGS* $53,668 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,952
Cost:
-
$5,952 101,400 - - - - - - $5,952
101,400
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$3,630
Cost:
$1,415
$3,630 61,838 - - - - - - $3,630
61,838
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,718
Cost:
$952
$3,330 56,721 $388 78 - - - - $3,330
56,721
kWh
$388
78
kW-months/year
-
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$671
Cost:
$1,639
$671 11,438 - - - - - - $671
11,438
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,566
Cost:
$1,770
$1,078 18,360 - - $155 - $333 - $1,078
18,360
kWh
-
-
kW-months/year
$155
-
$
$333
-
$
06: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT Savings:
$21,383
Cost:
$42,766
$21,383 365,270 - - - - - - $21,383
365,270
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,743
Cost:
$18,195
$16,128 274,756 $615 123 - - - - $16,128
274,756
kWh
$615
123
kW-months/year
-
-
$
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5
Cost:
-
$5 87 - - - - - - $5
87
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$53,668
Cost:
$66,737
$52,177 889,870 $1,003 201 $155 - $333 - $52,177
889,870
kWh
$1,003
201
kW-months/year
$155
-
$
$333
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost