IAC Assessment: UD1069
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1069
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2023
Principal Product Rubber Extrusion
NAICS 326299 - All Other Rubber Product Manufacturing
SIC 3061 - Mechanical Rubber Goods
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 171,136
Annual Production 10,144,812 Pounds
Production Hrs. Annual 5,880
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $568,647 11,888,250 kWh $0.05
Electricity Demand $381,510 22,584 kW-months/year $16.89
Electricity Fees $113 - $ -
Natural Gas $67,025 9,476 MMBtu $7.07
TOTAL ENERGY COSTS $1,059,252
RECOMMENDED SAVINGS* $98,256 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ Tgal $ $ $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$31,978
Cost:
-
$31,978 669,006 - - - - - - - - - - $31,978
669,006
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,796
Cost:
$5,078
$2,469 51,663 $1,327 79 - - - - - - - - $2,469
51,663
kWh
$1,327
79
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,461
Cost:
$952
$2,592 54,218 $1,869 111 - - - - - - - - $2,592
54,218
kWh
$1,869
111
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,894
Cost:
$1,403
$2,894 60,554 - - - - - - - - - - $2,894
60,554
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,799
Cost:
-
$1,045 21,857 $754 45 - - - - - - - - $1,045
21,857
kWh
$754
45
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,372
Cost:
$1,389
$911 19,051 - - - - - - $79 - $382 - $911
19,051
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
$79
-
$
$382
-
$
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$51,914
Cost:
$75,982
$(-19,809) (-414,421) $(-1,191) (-71) $35,966 9,827 $36,948 9,827 - - - - $(-19,809)
(-414,421)
kWh
$(-1,191)
(-71)
kW-months/year
$35,966
9,827
Tgal
$36,948
9,827
Tgal
-
-
$
-
-
$
08: 2.2514 COVER OPEN TANKS Savings:
$42
Cost:
$70
$42 882 - - - - - - - - - - $42
882
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$98,256
Cost:
$84,874
$22,122 462,810 $2,759 163 $35,966 9,827 $36,948 9,827 $79 - $382 - $22,122
462,810
kWh
$2,759
163
kW-months/year
$35,966
9,827
Tgal
$36,948
9,827
Tgal
$79
-
$
$382
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Ancillary Material Cost