IAC logo
IAC Assessment: UD1087
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1087
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2024
Principal Product Industrial fans
NAICS 333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564 - Blowers And Fans
Sales $50,000,000-$100,000,000
# of Employees 114
Plant Area (Sq.Ft.) 87,000
Annual Production 31,413 Units
Production Hrs. Annual 2,168
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,617 1,173,709 kWh $0.08
Electricity Demand $35,930 5,157 kW-months/year $6.97
Electricity Fees $4,748 - $ -
Natural Gas $9,911 6,421 MMBtu $1.54
Other Gas $2,574 1 MMBtu $2,574.00
TOTAL ENERGY COSTS $147,294
RECOMMENDED SAVINGS* $10,363 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,975
Cost:
-
$2,095 26,827 $880 126 - - - - - - - - $2,095
26,827
kWh
$880
126
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,335
Cost:
$1,068
$894 11,441 $441 64 - - - - - - - - $894
11,441
kWh
$441
64
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$684
Cost:
-
$458 5,876 $226 32 - - - - - - - - $458
5,876
kWh
$226
32
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$452
Cost:
$487
$319 4,081 $133 19 - - - - - - - - $319
4,081
kWh
$133
19
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,614
Cost:
$6,258
- - $177 25 $3,437 - - - - - - - -
-
kWh
$177
25
kW-months/year
$3,437
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$399
Cost:
$1,254
$358 4,590 - - - - - - $34 - $7 - $358
4,590
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$34
-
$
$7
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$303
Cost:
$900
$203 2,601 $100 14 - - - - - - - - $203
2,601
kWh
$100
14
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$601
Cost:
$2,093
- - - - - - $601 390 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$601
390
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$10,363
Cost:
$12,060
$4,327 55,416 $1,957 281 $3,437 - $601 390 $34 - $7 - $4,327
55,416
kWh
$1,957
281
kW-months/year
$3,437
-
$
$601
390
MMBtu
$34
-
$
$7
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost